Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Plumbing & electrical out buildings and Space Usage table

NC-2009 PIf3:Occupant and Usage Data
posted by  Erin Holdenried  on 

I have a building that has multiple separate enclosed buildings for electrical, fire tanks, and water tanks.

1
Tue Nov 6, 2012, 11:46 pm

MPR6

Retail-NC-v2009 EAc5:Measurement and verification
posted by  Ward Miller  on 

Has anyone tried earning 1 point for MPR 6 on this credit as is available in other rating systems?

1
Fri Nov 23, 2012, 1:37 am

Building Density Clarification

CS-2009 SSc2:Development Density and Community Connectivity
posted by  James Wieben  on 

The sample calculations in the Tool Kit example all have a building on the property. My real life example has some areas with surface parking and no building.

1
Sun Nov 25, 2012, 12:56 am

Defining 'one building'

NC-2009 PIf1:Minimum Program Requirements
posted by  Erin Holdenried  on 

I have a project with two adjacent buildings that are basically physically distinct structures with a short enclosed corridor that connects the two. Can this project be considered one building?

1
Wed Nov 7, 2012, 3:03 pm

Active ingredient

EBOM-2009 IEQc3.6:Green Cleaning—Indoor Integrated Pest Management
posted by  Katherine Ann Resurreccion  on 

Hi All, Our client uses pesticides/chemicals in their facility, some are those that are commercially available or sold for household use, however the active ingredient is not present on the SF haz

1
Mon Nov 12, 2012, 3:48 pm

WEc1 Option 2 Path 1

NC-2009 WEc1:Water Efficient Landscaping
posted by  Don Hardwick  on 

Hi, I have a project planning to use 100% non- potable water for irrigation.They are planning on doing this through collecting rain water.

1
Wed Nov 21, 2012, 9:12 pm

UnmetLoadHours - Do we have clarity yet?

NC-2009 EAp2:Minimum Energy Performance
posted by  Jean Marais  on 

The definition of Unmet Load Hours has been vague for quite some time. ASHRAE 90.1 2010 was supposed to address this issue. Do we have some resolution about this yet?

1
Fri Nov 9, 2012, 8:17 pm

Option 1 - is a residential element required?

CI-2009 SSc2:Development Density and Community Connectivity
posted by  R Jones  on 

If a project is pursuing option 1 development density calculations must there be a residential element recorded within the 60,000sf/acre figure? thank you

1
Sun Nov 25, 2012, 12:26 am

E -waste goes back to manufacturer

EBOM-2009 MRc8:Solid Waste Management—Durable Goods
posted by  Anna Korinkova  on 

Our building has a large number of tenants with separate management. Their IT equipment go back to the manufacturer and do not go to the building main waste stream.

1
Wed Nov 7, 2012, 4:34 pm

auto-shutoff faucets

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Jonathan Weiss  on 

I am sure this has been answered elsewhere in this listing but I am confused by the back and forth about auto-shutoff faucets, the most common commercial lavatory faucet in much of the work I am in

1
Wed Nov 7, 2012, 4:47 pm