EAp2- Option 2 Prescriptive Method The current project consists of an existing building that is being renovated along with a new addition to the building. The prescriptive method indicates that 1/2" of rigid insulation is required. Is this required for the existing building? What are the requirements to update the existing building envelope to the current ASHRAE standards? The new addition will be compliant to all ASHRAE prescriptive requirements. The addition is 40% of the entire project.