Forum quick links
no composite wood products
CI-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Adam Targowski on
What if the tenant was not installing any composite wood products within his scope of work? Does it mean that he get's this point automaticly or that he is not eligible for that point?
Energy Recovery Units - Baseline and Proposed Design ERUs
NC-2009 EAc1:Optimize Energy Performanceposted by Carlton Ross on
We have an existing facility (bus maintenance garage) which is attempting to be Certified.
Reasonable Site Boundary & Min. Building Area to Site Area Ratio
NC-2009 PIf1:Minimum Program Requirementsposted by Greengrade User on
Schools often cannot afford "choice" sites. We have a school with a 155 acre site, 70% of the site is a wetland.
Documentation of Design Air Speed
NC-2009 IEQc7.1:Thermal Comfort—Designposted by Catherine Sheane on
The LEED-NC 2009 EQc7.1 credit template asks us to document the Project Space Design Air Speed at 3 ft above the floor. According to ASHRAE 55, this should be a maximum of 40 FPM.
Core and Shell Building with Tenant Improvement
CS-2009 EAp2:Minimum Energy Performanceposted by Curtis Clark on
We have been contracted to design a core and shell building for a large office building. We applied for Core and Shell for LEED 2009.
Heat Pump for Domestic Water Heating
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by M.S. Chan on
We are using heat pumps for domestic water heating. (The water source will be from the campus/district condenser water system.) Can we take credit in the energy calculations using heat pumps?
LEED definition of Parking for Airport projects
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Pouy Phanphengdy on
What is LEED definition of Parking? Is it public parking?
SSp2 Environmental SIte Assessment (LEED Healthcare)
Healthcare-v2009 SSp2:Environmental site assessmentposted by Lesley Treacy on
Hi, I am working on the LEED aspects of a healthcare project in KSA. A full and detailed EIA Study for the project was completed to local standards and no contaimination was found.
Further normalized EUI
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by SENGATHIR SELVAN on
Hi there, in our efforts to achieve LEED EBOM certification for a production facility (garment washing plant) in Dhaka, we have implemented energy conservation measures.
Fan's power
CS-2009 EAp2:Minimum Energy Performanceposted by FABIO VIERO on
Hello all, two little questions about fan's power: - Which is exactly the difference between demand fan power, peak fan power and fan power allowance? - How do i have to relate baseline and propose