Forum quick links
Complex credit compliance?
NC-2009 EAp2:Minimum Energy Performanceposted by Kath Williams on
Project location: National Park Project Scope: Relocation of historic building Designation: Retains SHPO designation MR Credit 2: CIRs state relocation results in contributing to Material Reuse cr
Partial tenant occupancy with no core water fixtures
CS-2009 WEp1:Water Use Reductionposted by Laurent Kanago on
I am working on a project where there are no core spaces and all of the fixtures will be provided by the tenants.
Documenting assemblies under MRc5 Regional Materials
CI-2009 MRc5:Regional Materialsposted by Mark Krejcarek on
See Techinical advice from USGBC.
ACP Process : BREEAM equivalency
posted by CHRISTOPHE MATHIEU on
Could anyone let me know if USGBC released any extra information on the process to effectively use the BREEAM calculations for LEED energy credits...? The USGBC documentation and the online applic
Parking Capacity
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by VITAL DAFNE on
I am working on a hotel with two separate buildings. Since the parking will be used for the same hotel, the local zoning requirements were met.
Natural Ventilation Form Filling
NC-2009 IEQp1:Minimum IAQ Performanceposted by Aaron Levey on
Hi everyone, We have a residential project which has around 600 rooms naturally ventilated. I've prepared an excel sheet to demonstrate compliance with natural ventilation requirements.
Splitting credit for renewable energy to 2 different buildings?
NC-2009 EAc2:On-Site Renewable Energyposted by Renee Shirey on
We have a few schools from the same district being built at the same time, and we are considering adding PV to some/all of them.
Demoltion before possession
NC-2009 MRc2:Construction Waste Managementposted by Pamela Lippe on
If demolition is done by a landlord before a tenant has taken possession, does it have to be included in the calculations for LEED CI?.
Tenant storage vs Host Building storage.
CI-2009 MRp1:Storage and Collection of Recyclablesposted by Luis Leal on
We separate the waste in 3 in the tenant space: organic, paper and recyclables.
WEp1 Retail NC – Process Water
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Maria Porter on
Hi, I need help with my first process water calculation. On LEED Online: What does “ADO” mean? Could it be “Annual Days of Operation” maybe?