Forum quick links
Hospital Application
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Alexa Stone on
Could anyone shed some light as to how they might approach this PR with a hospital. There international restrictions on the use of aerators on facets, sinks etc because of pathogens.
exclusions
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Nate Maniktala on
Hi there, I was wondering if there are exclusions to some of the pieces of equiptment that would qualify as Energy Star?
LEED 2012 (now v4) Ballot Postponed until 2013
posted by Mara Baum on
From Rick: "In response to overwhelming feedback from our members, core LEED users and engaged stakeholders, USGBC announced today that it will delay ballot on LEED 2012 until June 1, 2013.
LEED-CI Cx after occupancy?
CI-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Leticia SooHoo on
I am working on a proposal for a LEED-CI project.
Is this a pause or rewrite?
posted by Bill Swanson on
Wow, Rob's still got influence. He even got them to change the name to v4.
Baseline Fan Power: Systems 6 and 8 ASHRAE 90.1-2007 Appendix G
NC-2009 EAp2:Minimum Energy Performanceposted by TOMAS URIBE on
If our Baseline building design HVAC system is ASHRAE’s #6 or #8 (according to TABLE G3.1.1B).
Inert post-installation materials
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Andrew Gil on
I am remembering hearing of an addendum, errata or CIR, clarifying that materials that undergo a chemical reaction DURING installation (e.g.
Plastics/PVC and Flooring
EBOM-2009 MRc9:Solid Waste Management—Facility Alterations and Additionsposted by Kim Wajda on
Neither are mentioned in the Solid Waste Conversion Factors table in the EB O&M manual so I calculated their conversions from pounds to cubic yards using the given density for "Mixed waste".
Basis for Individual Controls Count
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Terry Gorski on
For the individually occupied spaces in a typical office building, how close to the FTE occupant number being used in PI Form 3 does the total building occupant number being used for this credit ne
Thoughts about this pilot credit
Pilot-Credits SSpc55:Bird collision deterrenceposted by Todd Henderson on
We're attempting this pilot credit on a hospital here in San Francisco, California. I have some thoughts about the building facade requirements that I'm curious if anyone has also encountered. 1.