Forum quick links
Walk off mats (linked to IEQ5)
CI-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by R Jones on
Do projects have to consider the requirements for IEQ4.3 either through the CRI green label plus or other testing method for the walk off mats required under IEQ5 Indoor Chemical Pollutant Source C
IEQ prerequisite 3
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by ROZANA SILVA on
Dear sirs: I was told by the LEEDuser team that I would find updated information related to LEED rating systems, but today I found out that IEQ prerequisite 3 was not included in the Leeduser site.
It's 2012. Any updates on this?
posted by Mason Radkoff on
This non-support of OS X is killing me.
stairs, electrical rooms modeled?
NC-2009 EAp2:Minimum Energy Performanceposted by AAME User on
A couple of quick reference questions: 1) I have some miscellaneous areas in my project (stairwells, electrical rooms, elevator equipment room) being served by split system AC units and 4-pipe fan
High price differences between electricity and fossil fuel
NC-2009 EAp2:Minimum Energy Performanceposted by Hélène Vieillefosse on
In our building, fossil fuel is 30 time less expensive than electricity.
Buildings with Non-Standard Space Temp/Humidity Conditions
NC-2009 EAc1:Optimize Energy Performanceposted by Evelyn Dicks, EI, CxA on
I am working on an archive library that requires 50F and 35% RH indoor space conditions.
LEED 2012 time-line
posted by Melissa Merryweather on
Have USGBC published an updated time-line for LEED 2012? I have searched without luck.
Part II is out but LEED Online is not ready for Group project??
posted by Marcio Alberto Casado Pereira on
Hello, I've ready pretty much everything that is available on AGMBC - the guide itself, forunm, FAQs - but there's so much gray area!
Level of detail needed in ESC?
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Patty Breech on
This is vaguely referenced in other posts, but I'm still confused: what is the level of detail we need to submit for our written Erosion & Sedimentation Control (ESC) plan?
pursuing more credits after the performance period.
posted by Jim Park on
I am working on one EB project and it needs of more points to achieve a desired rating.