Clarification on the San Francisco list
EBOM-2009 IEQc3.6:Green Cleaning—Indoor Integrated Pest Managementposted by Mark Palmer on
Ever since the misprint in the original LEED 2009 EBOM Reference Manual, we here in San Francisco have had to answer a lot of questions from confused LEED APs re: our pesticide lists.
Pest Prevention by Design guidelines
EBOM-2009 IEQc3.6:Green Cleaning—Indoor Integrated Pest Managementposted by Mark Palmer on
While it is not yet part of the LEED guidelines, you may find our new "Pest Prevention By Design" guidelines useful.
IEQc6 vs IEQp1
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by ANDRZEJ ROMANOWSKI on
Hi, I work on a CS project ventilated by AHUs and approach both IEQp1/IEQc2 and IEQc6. For getting the IEc6 points both room controllers and operable windows are used.
Rainwater re-use
EBOM-2009 SSc6:Stormwater Quantity Controlposted by ethan adams on
We plan to use storage tanks for rainwater collection, then re-use the water in our cooling tower and possibly toilets.
Just Want to Know
NC-2009 SSc7.2:Heat Island Effect—Roofposted by PAWAN DAHIWAL on
It may be a silly question. If both both low sloped and steep sloped roof material is same, why steep sloped roof requires lower SRI paint?
IO Credit _ Option B (Additional Strategies)
EBOM-2009 RPc1:Regional Priorityposted by Pal Ahuja on
For our first LEED Canada EB & M Rating System project, We are working to achieve innovation in operations credits by using Option B(1-4 Points) that allows to propose your own strategy (one no
USGBC Credit Library Access
posted by Marilou Denum on
Hello All, I am preparing for the LEED AP BD+C exam and I tried to access the Credit Library on the USGBC website and for some reason when I get inside the credit library - Commercial Interiors-Re
Suspended Ceiling
NC-2009 EAp2:Minimum Energy Performanceposted by Omar Elrawy on
Dear all, I have a suspended ceiling with a 60 cm air gap between the panels and the reinforced concrete slab where all the electro-mechanical lies, but it doesn't act as plenum zone si
Smoking zone - away from pedestrian traffic
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Devani PERERA on
Hello, We have recently received a remark from a review that our designated smoking zone is not compliant since it is not 25 feet away from concentrations of building occupants and pedestrian traff
Credit Pending due to type of Manufactures documentation
Schools-2009 MRc4:Recycled Contentposted by Todd Bundren on
The manufactures that supplied the steel for my job all have some form of the following line in their support documentation for the recycled content: The Manufacture...utilizes the Basic Oxygen F