Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Cold, dark warehouse, round 3 (at least)

CS-2009 MRp1:Storage and Collection of Recyclables
posted by  Tiffany Moore  on 

I just received review comments back on MRp1 that I simply can't validate. I'd appreciate any help or advice that might be out there.

1
Thu Feb 13, 2014, 11:41 pm

Pool

NC-2009 SSc5.2:Site Development—Maximize Open Space
posted by  Jorge Lopez de Obeso  on 

If SSc2 is achieved, would a swimming pool count towards credit achievement? I´d think so, however I read other posts and there is a comment that says no... Does anyone have a positive feedback a

1
Fri Feb 14, 2014, 1:42 am

temporized faucet

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  LEEDme Lorenzi  on 

The water use reduction additional guidance says: the flow rate is determined using the flow rate in gallons per minute (gpm) and the duration setting (in seconds) for the metering faucet.

1
Fri Feb 14, 2014, 12:45 pm

Coconut Fiber

NC-2009 MRc6:Rapidly Renewable Materials
posted by  María Fernanda Aguirre  on 

Hi! Can coconut fiber count as both, recycled content (pre-consumer if coming from coconut sub-products industrial process) and a rapidly renewable material as well?. Thanks

1
Mon Feb 24, 2014, 12:30 pm

LEED CI Project Boundary - Non-conjoining Spaces

NC-2009 MPR2:Must be a complete, permanent building or space
posted by  Matthew Catterall  on 

We have a project for a single entity that owns and occupies an entire building. They are required to achieve LEED silver on this renovation per their local code.

1
Sat Mar 8, 2014, 3:34 am

CAPP Plan

NC-v4 SSp1:Construction activity pollution prevention
posted by  UGC/GPRO Office Account  on 

Hello, Does anyone have a Construction Activity Pollution Prevention plan example? What does it include? Erosion control, light pollution prevention, stormwater management plan

1
Fri Mar 7, 2014, 4:11 pm

Exterior Radiant Heaters

NC-2009 EAp2:Minimum Energy Performance
posted by  Seth Penchansky  on 

We are considering LEED certification for a four season golf range hitting facility that will have hitting areas with overhead radiant heaters and indoor conditioned areas as well.

1
Mon Feb 17, 2014, 4:17 pm

Submittals - requirements

Pilot-Credits EQpc78:Design for active occupants
posted by  Lily Li  on 

General:Register / Participate in the LEEDuser pilot credit forum / Survey Credit Specific:Plan & narrative, Participate - have a account or contribute to the discussion?

1
Sat Jul 26, 2014, 5:04 am

Compliance with Core Performance Guide Sections

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Ron Dean  on 

Hello everyone, I'm working in a smal project (just 2 floors) that is naturally ventilated overall.

1
Mon Feb 17, 2014, 4:33 pm

Possible Exemption?

EBOM-2009 IEQc1.3:IAQ Best Management Practices—Increased Ventilation
posted by  Alexis Thompson  on 

Our project building has 5 AHU systems; 4 of them significantly exceed ASHRAE (200%, 130%, 363%, 41%). The building is a laboratory and has very stringent requirements for OA delivery and IAQ.

1
Mon Feb 17, 2014, 5:04 pm