Forum quick links
Refrigerations system
Retail-NC-v2009 EAp2:Minimum energy performanceposted by Matteo Rigo on
Do the refrigeration system such as walk-in coolers or refrigeration cases must be detailed modeled in the simulation program (E+)? or is it possible consider them as a process loads?
Plan Template?
CS-2009 EAc5.2:Measurement and Verification—Tenant Submeteringposted by Melissa Wrolstad on
Is there an M+V plan template for this credit? There is a template for the M+V 5.1 credit. Thanks, Melissa
WE Fixture Group simple question
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Rick Alfandre on
I apologize for the simplicity of my question, but I want to make sure I am providing accurate information. If I have a commercial office building with 2 identical unisex bathrooms with no urinals
Exclude retail?
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Mike D on
Our project has got some retail on the ground floor of an office building that the design team does not want to include in the LEED assessment.
Renewable Energy Cost - Escalating Rate
NC-2009 EAc2:On-Site Renewable Energyposted by Timothy Casper on
Our project has a PV array which is leased by the building owner under a 20-year power purchase agreement. However, the agreed upon rate increases 2% each year during these 20 years.
Owner's LEED Projects Database- does anyone have it?
posted by Ludmilla Pavlova-Gillham on
Are you an owner or owner's repsentative and do you have a database of LEED documentation for your projects? I work in higher-education and we have a goold to build at the LEED Silver or higher lev
Parking spaces under a bridge
EBOM-2009 SSc7.1:Heat Island Reduction—Nonroofposted by Martin Vaclavik on
The parking area of our project is mostly located underground but there are some parking spaces on the ground level. Based on our calculation we can meet credit Option 2 requirements.
ASHRAE Advanced Energy Design Guide - Mixed office/warehouse bld
NC-2009 EAp2:Minimum Energy Performanceposted by Michael Smithing on
We're looking at a building that will have approximately 10,000 sqft. of office space and 10,000 sqft. of warehouse space.
LEED project Boundary different from Construction Documents?
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Gary Caraway on
Is it possible to have a LEED boundary that differs from the actual limit of disturbance shown in the construction documents?
Biodiesel Lawn Maintenance Equipment
EBOM-2009 SSc2:Building Exterior and Hardscape Management Planposted by Sara Zoumbaris on
Hi All, Has anyone had a project where the owner had lawn maintenance equipment that ran on biodiesel?