Site disturbance question
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Alicia Villanueva on
We have a huge project, if the project site is a greenfield, but it has neither trees nor plants; is it possible to install the "construction camps" outside the building footprint and once the proj
Purchasing Green Cleaning Equipment
EBOM-2009 SSc2:Building Exterior and Hardscape Management Planposted by Matthew Singer on
I would like some clarification as to whether the building itself needs to own the cleaning equipment or can it be owned by the vendor that cleans the building in order to receive the appropriate g
handling overflow
ND-v2009 GIBc8:Rainwater managementposted by Crystal Wu on
As per LEED requirements in this credit, up to X percentile rainfall events should be retained on-site, through infiltration, evapotranspiration and reuse, and must not be discharged into surface w
Green Cleaning credit achievement rates
EBOM-2009 IEQc3.2:Green Cleaning—Custodial Effectiveness Assessmentposted by stuart carron on
Thanks LEEDuser for publishing credit achievement rates - should be very helpful for the industry to address gaps. I find it curious that the achievement rate for this performance monitoring credit
ITE Study for use on Residential Projects
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Iris Amdur on
Hi, I have a Residential project that is adding new parking and has a local maximum parking requirement but no minimum parking requirement.
Integrative process
posted by Eddy Santosa on
Because I can't comment directly, I just would like to suggest the change on the language for the IPc1.
If we go to the option 2 in SSc7.1, do we need SRI>29 for road.
CS-2009 SSc7.1:Heat Island Effect—Nonroofposted by Somsak Jidmon on
If we are going to go with option 2 of the credit SSc7.1 - puting more than 50% of car parking to under the building structure.
Small HVAC Equipment & 0.5 lb rule
NC-2009 EAp3:Fundamental Refrigerant Managementposted by Nathan Lee on
Our project has removed all CFC based refrigerants on the main HVAC equipment. However we have some small HVAC equipment that use CFC Refrigerants.
Registration time limit for B&C rating system?
posted by Christina Nybergh on
Is there a time limit to register a project under B&C rating system? My project is already finished and the tenants have moved in, but we would like to pursue Retail NC.
Zone Isolation (HVAC 6.4.3.3.4)
NC-2009 EAp2:Minimum Energy Performanceposted by Alex Parella on
Our office building (Major Renovation v3 2009), located at 3C climatic zone, doesn’t exceed 25,000 ft2 of conditioned floor area, but has more than one floor. Different users will have their own s