Forum quick links
Core and Shell Renovation/Addition Parking not in Scope
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Ed Clark on
We are looking at a Core and Shell Renovation/Addition. We will pursue 2009 C&S and EBOM afterwards.
Is data being gathered and used?
NC-2009 MPR6:Must commit to sharing whole-building energy and water usage dataposted by Bill Swanson on
We commit to allowing USGBC to have access to our energy and water meter data from the Utilities. Does USGBC follow up and collect this building data for all v2009 projects?
OPR Never Produced
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Ed Clark on
I was added to the project after construction due to staffing changes. An OPR was never produced. The design meets and exceeds the owner's goals and commissioning has been completed.
"Less of Water" Term
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Abdulrahman Sherazy on
What does "less of water" mean? We have powder adhesive material for ceramic tiles. We sent it to the lab to determine the VOC content.
EAC1 Existing Building Renovation Baseline Rotations Required?
Schools-2009 EAc1:Optimize Energy Performanceposted by Matt Humphreys on
Is it required in the EAC1 energy model to perform the baseline building rotations of 90, 180 and 270º for an existing building that is being renovated provided the building footprint and exterior
Non-contiguous LEED boundary
NC-2009 PIf2:Project Summary Detailsposted by Todd Bundren on
I am working on a school renovation / addition project.
Minimum Recycling Area for residential building
NC-2009 MRp1:Storage and Collection of Recyclablesposted by SUNG SU KIM on
Hi guys. We are pursuing LEED v2.2. Our project have five separate residential building. We will provide recycling area where each building entrance.
LEED Online and iPad
posted by Elizabeth Brodbeck on
Is it possible to access LEED Online from my iPad?
Mandatory provision 6.4.3.2 Setpoint Overlap Restriction
CS-2009 EAp2:Minimum Energy Performanceposted by Sandra Holmström on
Mandatory provision 6.4.3.2 Setpoint Overlap Restriction When heating and cooling to a zone is controlled by separate thermostatic controls shall heating setpoint exceed cooling setpoint. In our C&
Exterior Walls and Ceiling Furred Out
NC-2009 MRc1.2:Building Reuse—Maintain Existing Interior Nonstructural Elementsposted by Sallyann Kluz on
We have an existing building that lacked insulation in exterior walls as well as the ceiling.