System type for Retail space
NC-2009 EAp2:Minimum Energy Performanceposted by Erika Duran on
I'm modeling a residential building with water to air heat pumps in all apartments.
Two building connected by bridge.
posted by Zonda E. Team on
The project involves two buildings, one is an office+workshop (50,000 sqf) and the second building is Dining area for the first building (7,000 sqf).
Occupancy values in ventilation calculations
posted by Daniel Padgett on
Hello, one of our review comments was that the occupancy values we reported in the ventilation calculations were inconsistent with those reported in other credits.
LEED EBOM 2009 Performance Period / Fees - Resurrected Project
posted by Randy Walsh on
Breathing new life into a comatose certification application already through preliminary review. Initial performance period 09/09/10 through 12/09/10. Application submitted 04/02/12. Preliminary r
Airport FTE Calculation
posted by MURAT DOĞRU on
Is there anybody got Airport FTE calculation ? It can be good base for us.
What is the LEED recommended teperatue for a
NC-2009 IEQc7.1:Thermal Comfort—Designposted by Mahbuba Khan AIA, LEED AP BD+C on
I am working on a mechanically ventilated manufacturing building in Bangladesh. What is the maximum acceptable temperature for this kind of building?
Calculating Views for Healthcare Interiors Projects?
Healthcare-v2009 IEQc8.2:Daylight and views - viewsposted by Kathy Wislocky on
Has anyone contemplated an alternate compliance path for calculating views for a healthcare interiors project?
Document review
Schools-2009 EAc3:Enhanced Commissioningposted by Adam Rustige on
Is reviewing I&O manuals and as-built drawings a requirement for enhanced commissioning? Thanks
Missing requirement on Pilot Form?
Pilot-Credits MRpc53:Responsible sourcing of raw materialsposted by Brian Leet on
When I go to the current version of the pilot credit form at http://www.usgbc.org/ShowFile.aspx?DocumentID=10106 there is no actual Material Source Disclosure language within the credit itself.
Proposed Vs Baseline
NC-2009 EAp2:Minimum Energy Performanceposted by PAWAN DAHIWAL on
My proposed case VAV does not have parallel fan power boxes.