Forum quick links
Judging I-BEAM Audit Parameter Conditions
EBOM-2009 IEQc1.1:IAQ Best Management Practices—IAQ Management Programposted by Jeff Schwab on
Hello LEEDuser.com community, My name is Pearl Frank. I am the Project Leader of a LEED EB Certification project on an existing campus building at Purdue University.
Occupied only OR All outdoor air ventilated spaces
EBOM-2009 IEQc1.4:IAQ Best Management Practices—Reduce Particulates in Air Distributionposted by Petr Vogel on
Dear all, is this credit related to all: • regularly occupied OR • occupied OR • all outdoor air ventilated spaces? When following the intent of the credit only occupied spaces would make sense t
Pilot Credit #45
Pilot-Credits SSpc45:Site assessmentposted by Kendal Neitzke on
The latest revisions to Pilot Credit #45 are very good.
October 2012 Addenda and Reviewer Comment
NC-2009 MRc7:Certified Woodposted by April Ambrose on
For MRc7, it changes the definition of "Chain of Custody (COC)".
B Corp certification
EBOM-2009 IOc1:Innovation in Operationsposted by Lisa Shulock on
Has anyone ever submitted an IO credit for B Corp Certification? My client is B Corp certified and wants to get an IO credit. Thanks for any thoughts on this.
Asbestos Remediation prior to demolition
Schools-2009 SSc3:Brownfield Redevelopmentposted by Ben Thompson on
We will be building a new school along side an existing school as a replacement.
solar exposure
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by gustavo goldman on
The building has one of the facades facing east-south. There are trees at street level that block the sun.
Cellulose-based paper products
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Anders Olson on
The project I am working on has specified a number of products that contain cellulose-based paper, including decorative laminates, signage material and ceiling tiles.
Temporary Natural Gas Winter Heat
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Greengrade User on
We are currently working on a LEED project where we are using temporary direct fire natural gas heaters for winter heat.
Timing for this Prereq
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Nelina Loiselle on
Need some advice on timing for this Prereq.