Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Option 1 Path 2 - What's Been Your Experience?

NC-v4 EQc4:Indoor air quality assessment
posted by  Cynthia Kaplan  on 

Hi all,

Show of hands for those that have used Option 1, Path 2, post occupancy flush out:

Do you provide trending data for both phases, or just the preliminary phase?

0

Mixed Model, Mechnical ventilation design

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Sandra Lee  on 

Hello all: I am a newbie here so may this question was brought up. We have a building with a canteen for workers. 

0

Leed for Airports

LEED Rating System Selection
posted by  Nora   on 

Hello everyone, could someone please send me the guide for airports published in August 2018?.

Thanks.

 

0

CDC COVID-19 Update November 2, 2020: Healthy Building Design for Pandemics and Beyond

Green Commons
posted by  Mary Ann Lazarus  on 

This just in from Liz York at CDC: There's a webinar on Friday 11/2 at 3-4 ET on Building Design and Pandemics.

1
Tue Oct 27, 2020, 4:25 pm

heat pump

NC-v4 WEc4:Water metering
posted by  Francesco Passerini  on 

In order to achieve this credit, permanent water meters can be installed also for "Boiler with aggregate projected annual water use of 100,000 gallons (378 500 liters) or more, or boiler of mo

3
Mon Oct 26, 2020, 7:11 pm
3
Mon Oct 26, 2020, 7:07 pm

Simulation Model upload

NC-v4 EAp2:Minimum energy performance
posted by  R.L. Bowen  on 

Hi! We recently uploaded a project for review. Unfortunately we missed uploading the actual energy model.

1
Tue Oct 27, 2020, 7:39 pm

Entryway mats stairs / staircase

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Maya Karkour  on 

Our project has a staircase in front of the entrance. The clearance between the entrance and the stairs is less than 3 meters (about 1 meter).

0