Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Central Plant Re-Location

EBOM-2009 EAp2:Minimum Energy Efficiency Performance
posted by  Reynaldo Castro  on 

Hello we are a LEED-EB O&M V3 Certified Project and are planning a major remodel of our existing building. Including Re-Location of entire existing central plant.

3
Fri Nov 11, 2011, 4:13 am

Exemplary Perfromance

CI-2009 SSc2:Development Density and Community Connectivity
posted by  Méabh Browne  on 

Hi, Is it possible to get an ID Exemplary Performance for this credit? I thought it wasn't but the form seems to indicate that it possible. If it is, then what are the requirements? Thanks

3
Fri Nov 11, 2011, 3:40 am

Exemplary Performance

Schools-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Thorn Grafton  on 

According to page 46 the LEED reference guide, it states the following: (FOR SCHOOLS - If a school bus system is being counted as 1 of the required bus lines to meet the requirements of Option 2, e

3
Thu Nov 10, 2011, 7:49 pm

update to LEED Interpretations database

General forums
posted by  Tristan Roberts  on 

In keeping with the orginal announcement indicating that the Interpretations database was "Beta," USGBC has rolled out an updated version.

4
Default Avatar
Civil Engineering Intern, LEED GA
Design Alaska
LEEDuser Basic Member
21 thumbs up
Thu Nov 10, 2011, 3:22 pm

Option 3 - Measurement

CI-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Robin Bass  on 

My team opted to use the measurement approach to document this credit for a recent 48,000 sq ft interior project.

4
Thu Nov 10, 2011, 2:53 pm

Code defines Maximum Open Space

NC-2009 SSc5.2:Site Development—Maximize Open Space
posted by  Daniel Hartsig  on 

Hello Everyone- I'm currently working on a project where the local code defines no minimum amount of open space. Instead, they define a maximum amount of open space (at 19% of site area).

2
Sustainability Manager
YR&G
LEEDuser Basic Member
151 thumbs up
Thu Nov 10, 2011, 12:26 am

Mandatory provision in LEED CS

CS-2009 EAp2:Minimum Energy Performance
posted by  Roger Moquin  on 

We actually construct a high rise office building with commercial area at the first level.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Nov 9, 2011, 7:37 pm

What about SIPs?

NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Products
posted by  Nelina Loiselle  on 

Would structural insulated panels made from PS foam cores sandwiched between OSB (Oriented Strand Board) panel faces qualify?

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed Nov 9, 2011, 1:24 am

What about for an initial interior fit-out?

Pilot-Credits PC20:Recycled Content
posted by   Habitech Distretto Tecnologico Trentino  on 

Hello all. I am working on a LEED-CI project. The situation is an initial interior fit-out (build-out of areas where there are no existing interior walls, finishes, etc.) and the tenant's scope of

4
Wed Nov 9, 2011, 12:13 am
5
Mechanical Engineer
Integral Group
LEEDuser Expert
342 thumbs up
Tue Nov 8, 2011, 10:59 pm