Basic Services Provided by the Client
NC-2009 SSc2:Development Density and Community Connectivityposted by Keerthi Ratnayake on
We have purchased an old factory and currently renovating the buildings to accommodate 2,000 workers.
New credit after the preliminary combined review process
posted by Stella Stella on
Hi, Can we submit a new credit after the preliminary combined review process(design+construction)?
EA p2
NC-2009 EAp2:Minimum Energy Performanceposted by John Lee on
I haven't energy modeled yet and am reviewing someone else's work on EAp2.
Carbon Offset Program
CI-2009 EAc4:Green Powerposted by Andreas Gyr on
I am working on a project that is performing it's own carbon offsets - ensuring that each investment in a carbon offset project has additionality, permanence, verifiability, etc.
Epoxy Flooring with ZERO VOC
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Susan Morris on
I have a project with a large area of Epoxy Flooring, this epoxy contains 0% V.O.C.'s does it count as an inert material; or is testing required? Thank you
Transients vs. Retail?
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Kathryn West on
is there a definition for transients versus retail? We have a dining hall and aren't sure how to classify the students who enter the building for meals.
How can I filled the LEED Online form
CS-2009 WEc3:Water Use Reductionposted by Somsak Jidmon on
My current CS Project using the water saving fixtures and saving the water up to 36% Reduction and our project will used the gray water from waste water treatment plant for all the flush fixtures w
System 8 VAV + PFP boxes
NC-2009 EAp2:Minimum Energy Performanceposted by Giuseppina Amorusi on
Dear All, We are modelling a Baseline Building with System 8 “VAV + PFP boxes” using HAP by Carrier. We are wondering how to model the VAV + PFP boxes according to ASHRAE 90.1 Section 3.1.3.14.
Data Center Baseline systems
NC-v4 EAp2:Minimum energy performanceposted by Vassil Vassilev on
Greetings everybody I'm modeling a datacenter and there are few issues about which I'm wondering how to proceed. The project consists of two building adhered to each other.
Dear Sirs,
We are consultants
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Maya Karkour on
Dear Sirs, We are consultants for a mall seeking LEED. Most of the spaces will be tenanted.