Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Project Currently Running at 10 Cyc - Am I eligible for 3 pts

EBOM-v4 WEc3:Cooling tower water use
posted by  Robert Cox  on 

Hello - Based on the water analysis provided by our vendor, we can achieve 11 cycles prior to requiring treatment. We are currently using 10 cycles. Does this qualify for 2 or 3 points?

1
Tue Aug 22, 2017, 1:09 am

Water metering for Fire safety

Retail-NC-v4 WEc4:Water metering
posted by  ilenia ottati  on 

Does water meter for fire emergency counts as additional meter for process water? In our project a tank is filled with water coming from municipal facility.

1
Tue Jul 11, 2017, 4:22 pm

Monitoring VRF unit

CS-2009 EAc5.1:Measurement and Verification—Base Building
posted by  Edmée Knight  on 

We are installing an air cooled VRF system with a DOAS in our building.

1
Mon Jul 3, 2017, 10:30 pm

Outdoor Airflow Measurement Device in AHUs

Schools-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  Thomas Kohmann  on 

There are a few AHUs in the project for which I work. One AHU supplies less than 20% of the non-densely-occupied rooms with its air volume flow, but still has outdoor airflow measurement devices.

1
Thu Aug 31, 2017, 12:53 am

Minimum Indoor Air Quality Performance Calculation

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Amal Venugopal  on 

My Project has one FAHU on roof which is supply treated Fresh air to all AHU"s, And each AHU further supplies the mixture of outdoor air and Recirculated air to various zone via VAV (no reheating,

1
Thu Aug 31, 2017, 6:23 pm

VOC emissions certificate

NC-v4 EQc2:Low emitting materials
posted by  Charline SEYTIER  on 

We received a LEED approved certificate concerning VOC emissions for Polyethylen Foam products.

1
Tue Jul 4, 2017, 4:19 pm

What is the baseline assumption for this credit?

CI-v4 IPc1:Integrative process
posted by  Betty Liu  on 

Hi All, We are designing a CI v4 office space in an existing high-rise building.

1
Mon Jul 17, 2017, 2:03 pm

Public Shuttle to Ferry/Rail

NC-v4 LTc5:Access to quality transit
posted by  Kristen Magnuson  on 

I know private shuttles do not count, and the LEED credit language emphasizes walking distance; however, can you count the trips at a ferry station and train station that are accessible through pub

1
Mon Aug 28, 2017, 3:55 pm

EAc1 Space Cooling and Heating

NC-2009 EAc1:Optimize Energy Performance
posted by  Mark Rawson  on 

Hello, When I generate the EAc1 Summary Report in HAP I have a negative percent savings in space cooling and heating in the performance rating table.

1
Fri Jul 7, 2017, 2:12 pm

Option 3 - strategy 2

CI-v4 MRc2:Interiors life-cycle impact reduction
posted by  Gail Napell  on 

The credit language reads: Design at least 50% of interior nonstructural walls, ceilings, and floors to be movable or demountable.

1
Tue Aug 29, 2017, 8:56 pm