Lighting Power Density Using The Building Area Method

NC-2009 EAp2:Minimum Energy Performance
posted by  Curtis Clark  on 

How do you apply Building Area Method (ASHRAE Table 9.5.1) to a higher education building that has five building area types? 1. School/University 2. Dining: Cafeteria/Fast Food 3. Office 4. Police/

1
Wed Jun 25, 2014, 2:22 pm

Ventilation (G3.1.2.6)

NC-2009 EAp2:Minimum Energy Performance
posted by  Curtis Clark  on 

A proposed building is designed which the minimum flow rate on the VAV box is the minimum outside air ventilation rate.

1
Wed Jun 25, 2014, 3:16 pm

Blower door test for 1 in 7 of each room model

NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Nadia Ayala  on 

Hi, I was wondering if the v2.2 option (HERS methodology) would still apply for v2009 in regards to the blower door test and number of units that must be tested.

1
Tue Feb 24, 2015, 10:37 pm

Commissioning

CS-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Karina Hanyzewski  on 

In a situation where the building undergoes tenant improvements before the shell construction is complete, does the commissioning work need to be adjusted to pick up the changes, even if they are t

1
Mon Jun 30, 2014, 1:03 pm

Calculating secure bicycle spaces and showers facilities

CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  MKK LEED  on 

Good Morning, I’m calculating the number of spaces for bicycles and showers facilities for C&S project > 300.000 sf.

1
Wed Jun 25, 2014, 8:33 pm

Alternative-fuel fueling stations for everyone?

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Jan Hesse  on 

We are working on a project with 350 parking spaces and several tenants. One tenant will install 11 alternative-fuel fueling stations (>3% of all parking spaces in the building).

0

Sewage Conveyance from the site

CI-2009 PIf2:Project Summary Details
posted by  Lakshmikanth Kousik Toppe Jeyabalan  on 

My project is in Singapore and it is a norm here that all the building sewage will be connected to the public utility drains and send for treatment, reclamation & disposal. I have been requeste

1
Tue Dec 29, 2015, 5:09 pm

feedback comment

Pilot-Credits WEpc10:Sustainable wastewater management
posted by  Mónika Egyed  on 

In our project, the pilot credit was achievable by 50% reduction from WC and urinal water use.

0

Concerning Carpet

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Omar Elrawy  on 

Dear all, We have a project where we intend to pursue Option 1 Path 1, We will install furniture after completing the flush-out, but the architect is concerned about the carpet install

1
Thu Jul 3, 2014, 8:08 am

VLT x WFR calculation exceeds 0.18

EBOM-2009 IEQc2.4:Daylight and Views
posted by  Indoor Environmental Quality Team LEED Community Project  on 

I am reviewing Option 1 Path 2 (Prescriptive) for a visitor's center project. There are several private offices where the VLT x WFR value exceeds the 0.18 threshold.

1
Sat Jul 26, 2014, 5:55 am