LEED NC 2009 EAc5 Measurement and Verification
NC-2009 EAc5:Measurement and Verificationposted by Jim Gardler on
We have developed a M&V plan for a mixed use Multi tenant high rise with commercial space in the building with the International Performance Measurement and Verification Protocol (IPMVP) as the
Location of Parking Lot
Pilot-Credits PC14:Walkable Streetsposted by Walter Parks on
We are developing an existing Historic building. The building and parking are already set up on the site and the parking lot is on the side of the building but fronts on the street.
Marking credits as Complete
posted by kelly ryan on
I am having difficulty with marking credits as complete. The forms have been filled out and meet the compliance. When in the scorecard page, I click on the Complete icon and nothing happens.
EBOM Credit MRp2 Solid Waste Management Policy
NC-2009 IDc1:Innovation in Designposted by Sara Goenner Curlee on
I am working on a NCv2009 project, and it is considering using MRp2 Solid Waste Management Policy as an Innovation Credit. I have a two part question.
Adding credits after Precertification Final Review
posted by Tracy Baker on
I need some clarity on this item. I am working on a LEED CS 2009 project. We have already had our Precertification Preliminary Review. I'm ready to submit for Precert. Final Review.
Hot Humid, Multi Family Compliance
Mid-Rise-v4 EQp1:Ventilationposted by Jason Biondi on
Will direct kitchen exhaust be required for multi family, hot/humid, mid rise projects, pursuing the natural ventilation approach to compliance with IEQ Ventilation prereq.? Best regards Jason
EAc1 error on template
NC-2009 EAc1:Optimize Energy Performanceposted by LEED Pro Consultant on
Hello! I am having problems with the EAc1 template. The EAp2 and EAc1 reports 2 points for a 12.3% savings of a Major Renovation.
Innovation through lease agreement
CS-2009 IDc1:Innovation in Designposted by Mike D on
Can an innovation credit be achieved through a tenant lease agreement which will require all tenants to install low-emitting materials for their space.
Building Surrounded by Buildings
CS-2009 EAp2:Minimum Energy Performanceposted by PAWAN DAHIWAL on
While developing an energy model for a building, can we take a benefit of modeling considering shading from the surrounded building in the proposed case and not in the baseline?
Plf's for a Master Site
NC-2009 PIf2:Project Summary Detailsposted by Donald Green on
A Master Site only needs to fill out Plf1 under the New LEED Platform as only that Plf shows up as possible in the scorecard. As LEED Online v3 does not have this capability, does a Master Site ha