LEED NC 2009 EAc5 Measurement and Verification

NC-2009 EAc5:Measurement and Verification
posted by  Jim Gardler  on 

We have developed a M&V plan for a mixed use Multi tenant high rise with commercial space in the building with the International Performance Measurement and Verification Protocol (IPMVP) as the

1
Mon Jun 16, 2014, 9:35 pm

Location of Parking Lot

Pilot-Credits PC14:Walkable Streets
posted by  Walter Parks  on 

We are developing an existing Historic building. The building and parking are already set up on the site and the parking lot is on the side of the building but fronts on the street.

0

Marking credits as Complete

General forums
posted by  kelly ryan  on 

I am having difficulty with marking credits as complete. The forms have been filled out and meet the compliance. When in the scorecard page, I click on the Complete icon and nothing happens.

0

EBOM Credit MRp2 Solid Waste Management Policy

NC-2009 IDc1:Innovation in Design
posted by  Sara Goenner Curlee  on 

I am working on a NCv2009 project, and it is considering using MRp2 Solid Waste Management Policy as an Innovation Credit. I have a two part question.

1
Sat Jul 26, 2014, 5:46 am

Adding credits after Precertification Final Review

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Tracy Baker  on 

I need some clarity on this item. I am working on a LEED CS 2009 project. We have already had our Precertification Preliminary Review. I'm ready to submit for Precert. Final Review.

1
Tue Jun 10, 2014, 3:45 pm

Hot Humid, Multi Family Compliance

Mid-Rise-v4 EQp1:Ventilation
posted by  Jason Biondi  on 

Will direct kitchen exhaust be required for multi family, hot/humid, mid rise projects, pursuing the natural ventilation approach to compliance with IEQ Ventilation prereq.? Best regards Jason

1
Tue May 9, 2017, 5:33 pm

EAc1 error on template

NC-2009 EAc1:Optimize Energy Performance
posted by  LEED Pro Consultant  on 

Hello! I am having problems with the EAc1 template. The EAp2 and EAc1 reports 2 points for a 12.3% savings of a Major Renovation.

1
Mon Jun 9, 2014, 11:09 pm

Innovation through lease agreement

CS-2009 IDc1:Innovation in Design
posted by  Mike D  on 

Can an innovation credit be achieved through a tenant lease agreement which will require all tenants to install low-emitting materials for their space.

1
Thu Jan 19, 2017, 10:47 am

Building Surrounded by Buildings

CS-2009 EAp2:Minimum Energy Performance
posted by  PAWAN DAHIWAL  on 

While developing an energy model for a building, can we take a benefit of modeling considering shading from the surrounded building in the proposed case and not in the baseline?

1
Tue Jun 10, 2014, 1:17 pm

Plf's for a Master Site

NC-2009 PIf2:Project Summary Details
posted by  Donald Green  on 

A Master Site only needs to fill out Plf1 under the New LEED Platform as only that Plf shows up as possible in the scorecard. As LEED Online v3 does not have this capability, does a Master Site ha

1
Tue Jun 10, 2014, 7:41 pm