Forum quick links
ANSI/BIFMA M7.1-2011
CI-2009 IEQc4.5:Low-Emitting Materials—Systems Furniture and Seatingposted by severine secret on
we're considering using a furniture system component which has been tested thru ANSI/BIFMA M7.1-2011, not 2007.
EAp2&c1 - Case 2 Option 2B Normalization
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Lourdes Salinas on
We are working on a manufacturing plant in Mexico that began operations in 2011.
California Specifications Section 01350
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Sheela I on
California Specifications Section 01350 and "California Department of Heath Services standards" are these one and the same?
(Jacob) Calculating for Future Growth
posted by Brett Beckemeyer on
If I have a building with a built-in percent of future growth that is predicted to happen over the next 10 years how do I incorporate those people into my FTE?
Core and shell dedicated exhaust systems?
CS-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Mike D on
Do the projects under core and shell have to providde dedicated exhasut systems for tenant print or copy rooms?
Zero-lot line project, but required to install street trees
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Courtney Royal on
Our project is in NYC and pretty much on zero-lot line property with very little open space.
LEED Canada 2009 option 1
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by nancy picard on
Our project is a retail center and only option 1 is available to us for credit SS4.4.
Vandal-resistant aerator
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Marc Mondor on
Hello, We just got our review back for a new construction of an office building. For this credit we had a comment from the reviewer, that we have never encounter before.
NC-v2.2 certified project - How to certify a large new addition
posted by Michelle Bombeck on
We have a NCv2.2 certified building that is now constructing an addition. This addition was planned years ago and was registered as an NCv2.2 project but was then put on hold.
LEED for Homes
CI-2009 SSc1:Site Selectionposted by Ryan McEvoy on
We have a project that is moving into a building that has been certified under LEED for Homes Mid-Rise. Can the project still pursue option 1?