Forum quick links
Peak Shaving Strategies
NC-v4 EAp2:Minimum energy performanceposted by Dave Hubka on
The energy used by electric vehichle charging stations within the LEED Project Boundary is not included within the eneryg model.
LEED point adjustment when ASHRAE 90.1-2019 is used as baseline
NC-v4.1 EAp2:Minimum Energy Performanceposted by elvin ruya on
Is there a direct correlation for LEED points when ASHRAE 90.1-2019 baseline is used instead of 2016?
Does 100% previously disturbed area (or 100% greenfield) qualify for this credit?
NC-v4 SSc2:Site development - protect or restore habitatposted by Kathy Wong on
Hi all,
Collection rainwater area outside the boundary - SS Rainwater Management
NC-v4.1 SSc4:Rainwater Managementposted by Juliana Candido on
We are working on a project whose LEED Boundary covers the whole exterior area of the site, but there is an existing building that will not be altered.
Concrete Mixes Counting as Separate Products - One EPD
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Summer Gorder on
The Concrete supplier utilized multiple "mixes" of concrete in the project. A mix has slightly different functions, which I think would mean it is a separate product based on the USGBC definition.
Any HAP file that contain both of the proposed building and the baseline
NC-v4 EAp2:Minimum energy performanceposted by Mohamed Abdelrahim Abdelaal on
I’m new in modeling, I have a building need to be simulated for leed rating, Can you please share a "HAP" file that contain both of the proposed building and the baseline for any project as a sampl
IN - Heat Island Mitigation with Cool Walls
NC-v4.1 INc1:Innovationposted by Jorge Ramírez Hernández on
Greetings,
Pilot Inclusive Design
Pilot-Credits INpc125:Inclusive Designposted by Laurie Johnson on
I am working on a LEED CI and WELL at Scale project.