Forum quick links
Calculating Conditioned Area
NC-v4 EAp2:Minimum energy performanceposted by Keith Wallace on
Given a building with all conditioned spaces, what is recommended or required to determine the conditioned area square footage? Do you take measurements from the exterior face of the exterior
Water-less Cooling Tower
CS-v4.1 WEc3:Optimize Process Water Useposted by John Bello on
Our cooling system does not use any water. Instead we are planning to use a R410-a refrigerant. Would this classify for full compliance with Option 2 or Option 3.
non-attainment area for PM2.5
NC-v4 EQp1:Minimum indoor air quality performanceposted by Francesco Passerini on
In Europe which parameters shall be considered to establish whether the site is non-attainment area for PM2.5?
ID+C CI v4 - Innovation: Purchasing - lamps
EBOM-v4 MRc2:Purchasing - lampsposted by Anna McGee on
Hello - We're looking into the Innovation credit for low/no mercury lamps for our CI renovation. The innovation credit has the below notice:
Barriers in implementing Material Transparency in LEED v4 projects
posted by SUSAN THOMAS on
What are the challenges in determining the environmental qualities and human health impacts of building materials or products in LEED v4 projects?
Construction Waste Recycling Plant distance from Site
CI-v4 MRc6:Construction and demolition waste managementposted by Ana Mendoza on
Hello
We are currently working in a location where there aren't any gypsum recycling plant within a 200 mi radius. We have been looking
Design-Build CxA
CI-v4 EAc1:Enhanced commissioningposted by Mark Kohles on
In USGBC's "Who can be a Cxa" document (https://www.usgbc.org/resources/who-can-be-cxa), an independent company, not a member
What is the best value about two different interpretations of a cold room system for LEED points.
CS-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Josée Lupien on
Hello,
We have an issue about how to perform an EPD project for a client.
Our client would like an EPD for their Insulated Metal Panels used for cold room system.
Submeter 2 water subsystems but only one system in the building
CS-v4 WEc4:Water meteringposted by Kristina Pobre on
The credit requires to submeter at least 2 of the following subsystems: irrigation, indoor plumbing fixtures and fittings, domestic hot water, boiler, reclaimed water, and other process water.
Campus project with central plants serving several buildings
NC-v4 EAp2:Minimum energy performanceposted by Yoyo Shek on
Hi All,
Our project composed of several buildings which share a group of main central plants (including several chillers and cooling towers).
Does below approach correct?