Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Approved Bicycle Storage

NC-v4 LTc6:Bicycle facilities
posted by  Summer Minchew  on 

I read and understand the USGBC guidance regarding the selection of bike racks, that “Bicycle racks should reflect best practices in design and installation.

4
Default Avatar
Green Building Consultant
LEEDuser Basic Member
20 thumbs up
Thu Aug 22, 2019, 3:22 pm

2 rooms

CS-2009 MRp1:Storage and Collection of Recyclables
posted by  gabriel Morales  on 

Hi, in our project we have reduced the complexity of the land areas, this has affected garbage have 2 rooms on the same level with easy vehicular access for trash removal.

2
Architect / LEED AP BD+C
KILTIK Consultoría
LEEDuser Basic Member
36 thumbs up
Thu Aug 22, 2019, 12:24 pm

Formaldehyde Emissions Evaluation Requirements

CI-v4.1 EQc2:Low Emitting Materials
posted by  Rosa Cheney  on 

We are looking at the formaldehyde emissions evaluations requirements for v4.1 (pasted below) compared to v4.  We found it odd that the third bullet point references both a European (EN 717-1:

1
Mon Nov 18, 2019, 5:49 pm

Public lavatory (restroom) faucet water sense?

CI-v4 WEp1:Indoor water use reduction
posted by  Carlos Dobobuto  on 

Hi, we are looking for a Public lavatory (restroom) faucet with water sense label but all we have found have higher consuption that the base line.

1
Sun Aug 25, 2019, 3:28 pm

PIf2 Site Characteristics for individual building project on a LEED Campus

Schools-2009 PIf2:Project Summary Details
posted by  Yasha Ogg  on 

I have a project that is getting built in two phases on a LEED Campus. The first phase includes the construction of a new 3-8 grade building.

0

How long after a project is completed can credits be submitted?

Healthcare-v4 INc1:Innovation
posted by  Stephanie Kreps  on 

If a new construction project is already registered in LEED online, can the credit submittal process begin after the building has been completed?

0

Trellis in Vegetated Area

NC-2009 SSc5.2:Site Development—Maximize Open Space
posted by  Summer   on 

I'm working on a project with an open space and vegetated area compliant to the credit requirement.

0

Are Shades 'Furniture and Furnishings'?

CI-v4 EQc2:Low emitting materials
posted by  Julie Hendricks  on 

Motorized  and manual shades (such as Mechoshade) are in Division 12.  Do they count as "stand-alone furniture items" that must be included in low-emitting materials calculations?

4
Mon Aug 19, 2019, 3:58 pm

RoHS

SD Leaders
posted by  John Mlade  on 

 

Hello all,

0

Update information for previously awarded credits

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Silvia Ruiz  on 

Our project got back the Final Design Review, but changes that affect one Awarded credit occurred during construction.

4
Mon Aug 19, 2019, 3:11 pm