Forum quick links
10% exclusion
EBOM-2009 SSc7.2:Heat Island Reduction—Roofposted by Varun Chandra on
We have a project with an office tower (white TPO) and a detached 2-story annex (mod-bit BUR). The annex is 7% of the total building area.
EA Advanced Energy Metering
NC-v4 EAc3:Advanced energy meteringposted by Donald Green on
I would like to clarify how a small project can comply with advanced energy metering.
Energy Data of buildins in Saoudi Arabia
NC-v4.1 EAp3:Building-Level Energy Meteringposted by Guillaume Rose on
Hi everyone,
I would like to know if anyone knows of a site that provides measured consumption data for leed certified buildings in Saudi Arabia?
Thank you for your help,
WS Label Required for Aerators
NC-v4 WEc2:Indoor water use reductionposted by RDK E&S on
We received a LEED comment on a residential project where we installed flow restrictors to reduce the faucet flow rate to 0.5 gpm.
Achieving credit ( 1 Innovation point?) for having a Green Cleaning Policy with a NC K-12 School Project
NC-v4.1 INc1:Innovationposted by Michael McDonald on
A few years back on NC Projects Achools were able to achieve 1 Innovation Point on NC Projects by Implementing a Green Cleaning Policy.
Underground warehouse on prime farmland
Warehouses-NC-v4 LTc2:Sensitive land protectionposted by Michele Di Martino on
Hello everybody, I'm dealing with a project of a new underground warehouse that is going to be developed on an existing prime farmland.
Changing Total Gross Floor Area in PIf2 during Preliminary Design Review
NC-2009 PIf2:Project Summary Detailsposted by Edgar Arevalo on
I'm currently going through the preliminary design review credits, and I was stumped on the comment for IEQp1: Minimum Indoor Air Quality Performance surrounding the 40,198 sq. ft.