LPD for IT Rooms and IT Closet
CI-v4 EAp2:Minimum energy performanceposted by Edgar Arevalo on
So according to 2010 ASHRAE 90.1, there is no LPD requirements for IT closets. Yet the lighting for the project in question was adhereing to the ASHRAE 2016 90.1 standard, which has a space t
Heat Rejection and Cooling - Lab Equipment Process Water Use
NC-v4 WEp2:Indoor water use reductionposted by Allison Wilson on
In the case of lab equipment such as sterilizers and lab glassware washers, water is frequently super-heated and recirculated within the chamber to achieve cleanliness and sterilization which appea
Anti-Ligature fixtures
NC-v4 WEp2:Indoor water use reductionposted by Leanne Conrad on
The reference guide is clear that special or unique water closets can be excluded from the credit calculations, my query is does this expand to special or unique fixtures?
Electrochromic Glazing for LEED v4 EQ 8.1 Quality Views Credit
NC-v4 EQc8:Quality viewsposted by Shalini Gali on
LEED v4 states that “View glazing in the contributing area must provide a clear image of the exterior, not obstructed by frits, fibers, patterned glazing, or added tints that distort color bal
No Exterior Lighting Query
EBOM-v4.1 SSc3:Light Pollution Reductionposted by Wafa Arif on
We have a high-rise building for which we are pursing LEED EBOM v4.1. Since that building only has an LED vertical columns lighting on the facade. Other than this no exterior fixtures are used?
Pursuing Whole Project Pilot in residential buildings
Pilot-Credits WEpc115:Whole Project Water Use Reductionposted by Paul Erlichman on
Hello,
I posed a similar question in the forum for the Optimize Proces Water Use credit, but I figured I would post an addendum of sorts in the pilot credit forum.
Occupant comfort survey and transportation survey
EBOM-v4.1 EQp4:Indoor Environmental Quality Performanceposted by Jayaprasad ramamoorthy on
We are currently working on the prison project for LEED existing building certification.
95 percentile of precipitation data
CS-v4 SSc4:Rainwater managementposted by Marine Petrosyan on
Hi, All!
Should the soil be previously disturbed, before the owner starts to do anything with it?
CS-v4 SSc2:Site development - protect or restore habitatposted by Marine Petrosyan on
Hi, All!
The Site Development - Protect or Restore Habitat credit requires, that the calculations are done with the previously disturbed land.