Forum quick links
Hiring - LEED Project Administrator
posted by Trisha Highnote on
Rennell Associates, LLC, is seeking a candidate to join our team as LEED® PROJECT ADMINISTRATOR.
Using Existing LEED certified Parking for EV Charger Installation in New Project
NC-v4 LTc8:Green vehiclesposted by sompoche sirichote on
We have a two-phase project: Phase 1 and Phase 2.
Technical Reference Request: Definition and Use Cases for Greenhouse Gas (GHG) Emissions Metrics
posted by Victor Braciszewski on
Hello Community!
Alternative measurement to material costs
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Ingrid Pohl on
I'm working on a project where we cannot gather the information of the specific material costs. Is it possible to calculate the percentage based on the weight or the volume instead of by cost?
Mastic
NC-v4.1 EQc4:Indoor Air Quality Assessmentposted by Michelle Lockert on
Can anyone tell me if it is okay to utilize mastic “outside” the building envelope?
Thank you.
Pilot credit Design for Indoor Air Quality and Infection Control
NC-v4 INc1:Innovationposted by Emily Purcell on
Didn't see an existing thread for this one, so I'll start one here. I am including this on a couple different projects and getting ready to submit one for review now.
Requiring sustainability accreditation in your firm?
posted by Margaret Montgomery on
This is sort of dragging up an ancient topic, but curious how your firms are currently addressing accreditation (LEED AP, WELL AP, LFA, etc.).
2023 Global Temperature Report
posted by Mary Ann Lazarus on
This just in from Berkeley Earth. The definitive report on 2023 global temperatures.
Project vs Lighting boundary
NC-v4 SSc6:Light pollution reductionposted by Bill Swanson on
There appears to still be confusion on the differences between the Project Boundary and the Lighting Boundary. The Project boundary is the same as shown in every other credit.