Forum quick links
roll-out mat specs
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by NA AN on
I just want to check if there are any specific product specs for a LEED compliant roll-out mat? thank you Na
LED Lamps in Fixtures Designed for Other Lamps
NC-2009 EAc1:Optimize Energy Performanceposted by Pat Thomas on
We are planning to use fixtures designed for use with MR-16 or incandescent lamp but will be installing LED lamps.
LEED CS and CI - fit out works made by the developer
posted by Elodie DUMAS on
Dear all, I have a question regarding LEED CS and LEED CI rating systems.
Private Vs Public Lavatories
posted by Ben Carstensen on
Is there a significant distinction between private vs public lavatories, or is the "Total Daily Uses" calculation sufficient given the correct Uses/Day (FTE, Transient, Retail Cust., Students)?
EPA Number
EBOM-2009 SSc3:Integrated Pest Management, Erosion Control, and Landscape Managementposted by Alicia Villanueva on
If one of the product used does not have an EPA Number: are we still eligible for this credit? GH
Multiple Building and On Campus - LEED Online functionality
posted by Tate Walker on
I am considering registering a Veterans Home Campus utilizing Mult Bldg and On Campus. Have the full funtionality issues been resolved? if not when will full functionality be available?
Task Lighting Lamps
EBOM-2009 MRc4:Sustainable Purchasing—Reduced Mercury in Lampsposted by Saju Varghese on
Do task lighting lamps need to be included in this credit?
Clarification for Conference Room
EBOM-2009 IEQc2.2:Controllability of Systems—Lightingposted by Alexa Stone on
Hi All, For a convention center building where over 90% of the building consists of "multi-occupant spaces" i.e.
HVAC duct insulation adhesive
CI-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Lavanya Veerappa on
Hi, It is a general practice to use Fevicol SR 998 as duct insulation adhesive due to its bonding with the ducting material. However the VOC content of this product is 700 grams per litre.
Project Boundary 2 buildings on site but only 1 certification
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Elke Malleier on
Hi experts, I would appreciate your advice on the follwoing, please. I am unsure to draw the project boundary in situation described below: - Entire project site (including dormitory building) wil