One paint / two applications / two standards?

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Nereyda Rodriguez  on 

We have a waterborne acrylic enamel that is used in two applications in our project. When applied to steel joists, conduit, etc.

1
Fri Jan 18, 2013, 5:13 pm

"Other" Sealants and Sealant Primers

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Michelle Rosenberger  on 

What is the definition of the "Other" category in Rule 1168? I have a BASF product identified as a non-porous sealant primer with 584 g/l that they say complies with EQ4.1 on their letterhead.

1
Thu Mar 21, 2013, 3:15 pm

heat recovery system for base case ?

CS-2009 EAp2:Minimum Energy Performance
posted by  shashank jain  on 

We are modelling our CS case in Sao Paulo (Climate 2A).

1
Fri Jan 18, 2013, 3:23 pm

embodied energy

Pilot-Credits MRpc63:Whole building life cycle assessment
posted by  Jody Solell  on 

Most if not all construction sites have a generator running to power the site. On new SF home construction the amount of gasoline used during the construction phase is about 100-150 gallons.

1
Tue Nov 5, 2013, 6:07 pm

Unmet Loads Hours

NC-2009 EAp2:Minimum Energy Performance
posted by  VICTOR MORENO  on 

Hello, i have a question about Unmet Loads Hours. This value is (Time Setpoint Not Met During Occupied Heating + Time Setpoint Not Met During Occupied Cooling) or (Time Setpoint Not Met During Hea

1
Sun Jan 20, 2013, 7:54 pm

Tenant submetering

CS-2009 EAc5.2:Measurement and Verification—Tenant Submetering
posted by  Dina Ammar  on 

The developer's CS project consists of two large leasable spaces. One wing to be used for a department store, the other one to be used as furnished apartments.

1
Wed Mar 6, 2013, 6:09 pm

Recycling of the factory

NC-2009 MRp1:Storage and Collection of Recyclables
posted by  Jatuwat Varodompun  on 

We planned to apply LEED for a factory which has a recycle yard. The yard is openned and will be used to sort the wast for recycling without any clear boundary of waste types.

1
Fri Feb 1, 2013, 12:29 am

survey - regular building occupants or FTE?

EBOM-2009 SSc4:Alternative Commuting Transportation
posted by  Lothar Lustich  on 

We need a hint for using the correct occupants.

1
Wed Jan 30, 2013, 12:49 am

LEED NC project boundary

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Jatuwat Varodompun  on 

We purchased an abandon building which will be renovated for both envelope, Electric, and HVAC. The problem is we will own only have of the building.

1
Mon Jan 21, 2013, 3:34 pm

Surface brightness requirement

Pilot-Credits EQpc22:Interior lighting - quality
posted by  Fatima Plaza  on 

We are applying for this pilot credit in a building which facade consist of a double skin facade, the exterior layer is opaque with windows (existing facade of the building before project renovatio

1
Wed Nov 20, 2013, 6:46 pm