One paint / two applications / two standards?
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Nereyda Rodriguez on
We have a waterborne acrylic enamel that is used in two applications in our project. When applied to steel joists, conduit, etc.
"Other" Sealants and Sealant Primers
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Michelle Rosenberger on
What is the definition of the "Other" category in Rule 1168? I have a BASF product identified as a non-porous sealant primer with 584 g/l that they say complies with EQ4.1 on their letterhead.
heat recovery system for base case ?
CS-2009 EAp2:Minimum Energy Performanceposted by shashank jain on
We are modelling our CS case in Sao Paulo (Climate 2A).
embodied energy
Pilot-Credits MRpc63:Whole building life cycle assessmentposted by Jody Solell on
Most if not all construction sites have a generator running to power the site. On new SF home construction the amount of gasoline used during the construction phase is about 100-150 gallons.
Unmet Loads Hours
NC-2009 EAp2:Minimum Energy Performanceposted by VICTOR MORENO on
Hello, i have a question about Unmet Loads Hours. This value is (Time Setpoint Not Met During Occupied Heating + Time Setpoint Not Met During Occupied Cooling) or (Time Setpoint Not Met During Hea
Tenant submetering
CS-2009 EAc5.2:Measurement and Verification—Tenant Submeteringposted by Dina Ammar on
The developer's CS project consists of two large leasable spaces. One wing to be used for a department store, the other one to be used as furnished apartments.
Recycling of the factory
NC-2009 MRp1:Storage and Collection of Recyclablesposted by Jatuwat Varodompun on
We planned to apply LEED for a factory which has a recycle yard. The yard is openned and will be used to sort the wast for recycling without any clear boundary of waste types.
survey - regular building occupants or FTE?
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Lothar Lustich on
We need a hint for using the correct occupants.
LEED NC project boundary
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Jatuwat Varodompun on
We purchased an abandon building which will be renovated for both envelope, Electric, and HVAC. The problem is we will own only have of the building.
Surface brightness requirement
Pilot-Credits EQpc22:Interior lighting - qualityposted by Fatima Plaza on
We are applying for this pilot credit in a building which facade consist of a double skin facade, the exterior layer is opaque with windows (existing facade of the building before project renovatio