"total gross square footage / gross floor area"
NC-2009 PIf2:Project Summary Detailsposted by Carrie Laurendine on
LEED-NC PIf2 - second row prompts user to fill out "total gross square footage / gross floor area" im confused what they are asking for. and also not sure where to look to research this.
green roof that is also accessible
NC-2009 PIf2:Project Summary Detailsposted by Carrie Laurendine on
building has a green roof that is also a courtyard. originally, another staff member excluded this area from total square footage. to me this seems incorrect?
WEp1 and occupancy definition
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by R Jones on
I have a fit out project which is occupying a new core and shell building.
Infiltration diff between proposed/baseline models is possible?
CS-2009 EAc1:Optimize Energy Performanceposted by CHRISTOPHE MATHIEU on
I’m modeling a building for C&S in France. Normally in my baseline and proposed models I put the same infiltration (n50 = 0.14 ach) for both buildings.
Bicycle Network
Pilot-Credits PC30:Alternative Transportationposted by Nate Steeber on
I guess there are a few clarifications necessary for me to see if the project meets. It says that 'Homes' is an applicable rating system - does this apply to single family - I would assume yes.
MET Rate for Retail Space
NC-2009 IEQc7.1:Thermal Comfort—Designposted by Omer Moltay on
What MET rate would you assume for the ASHRAE-55 compliance for retail areas (ie. supermarket, clothes retail)?
Calculating CO2 Concentrations in a Zone
CS-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Marcio Alberto Casado Pereira on
Hi! I'm finishing a project and must indicate the levels to be configured in ppm CO2 sensor environments. As an example, I have a training room with 8 people and an area of 497.29 sf.
concession area window/roll up door exposed to the outside
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by renee jimenez on
I’m working on a facility that has several concession areas that are enclosed with a solid roll up door that are open to the outside when occupied. The space is occupied only during event.
Salvaged and Regional Materials
EBOM-2009 MRc3:Sustainable Purchasing—Facility Alterations and Additionsposted by Summer Gorder on
For materials that were removed during demo and then re-used during construction, can you count these materials as salvaged as well as regional, meaning can you count the cost twice?
Multi-family - Energy Disclosure Requirement
NC-2009 MPR6:Must commit to sharing whole-building energy and water usage dataposted by Jeremy Kuhre on
Courtney, we have a similar situation to yours in that we do not have access to whole building utility data. We are currently in the process of certifying several large multi-family projects under