Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Default or maximal fixture uses ? flow restrictors ?

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Nicolas MOLLE  on 

Hello, I have two questions about this prerequisite: 1st. Are the flow described in the baseline a maximum flow for the project ?

1
Wed Sep 12, 2012, 12:07 pm

Building for a single tenant but with laboratories and offices

LEED Rating System Selection
posted by  Nicolas MOLLE  on 

Hello, We are going to register a project for ALSTOM which contains: Offices, laboratories, restaurant and workshop in a whole building of nearly 30 000 m².

1
Wed Sep 12, 2012, 10:22 am

Showers for SSc4.2

CS-2009 WEp1:Water Use Reduction
posted by  BH .  on 

Hi, I have doubts regarding showers for bicycle racks calculations for WEp1.

1
Wed Sep 12, 2012, 3:53 pm

Plastic waste

NC-2009 MRp1:Storage and Collection of Recyclables
posted by  Nicolas MOLLE  on 

Hello, I would like if it's possible to sort plastic waste with other banal (common? I don't know the english word) industrial waste ? Or do we need a specific garbage ?

1
Wed Sep 12, 2012, 9:08 pm

Recycling lbs per day

CS-2009 MRp1:Storage and Collection of Recyclables
posted by  Kevin Short  on 

I am trying to determine how many pounds of recycling waste per day my building will generate. Any specific formula to use? It is a 55,000 sq ft office building.

1
Wed Sep 12, 2012, 7:55 pm

[FR] Water Closet dual flush fixtures 2-4 l ?

NC-2009 WEc3:Water Use Reduction
posted by  Nicolas MOLLE  on 

Hello, To obtain -40%, we'd like to use (in France) Water Closet dual flush fixtures 2-4 liters.

1
Fri Nov 23, 2012, 3:46 am

Toilet Scope

CI-2009 WEp1:Water Use Reduction—20% Reduction
posted by  sompoche sirichote  on 

If our client who own the entire building would like to do the fitout for only 1 floor.

1
Thu Sep 13, 2012, 1:46 pm

Simulation: Baseline Chiller Part Load Performance

CS-2009 EAp2:Minimum Energy Performance
posted by  Marco Abdallah  on 

We are pursuing Option 1 (Whole Building Simulation).

1
Wed Sep 19, 2012, 6:47 pm

kitchen faucets

CS-2009 WEp1:Water Use Reduction
posted by  Alicja Bieszyńska  on 

We completed the Design Submittal when there was no tenants = no information on their fit-out space. Right now, one of our clients want to include additional tea room with kitchen sink.

1
Wed Sep 19, 2012, 1:34 am

Silicone and epoxy

EBOM-2009 MRc3:Sustainable Purchasing—Facility Alterations and Additions
posted by  Ruba Al-Foraih  on 

Would silicone and epoxy be certified under the Bay Area Air Quality Management District (BAAQMD) regulation, or shall I consider them as paints under Green Seal?

1
Thu Sep 13, 2012, 4:27 pm