Two Year HVAC Electricity Use

CI-2009 EAc4:Green Power
posted by  Joseph Greene  on 

Our LEED project occupies 30% of the total building floor area. The energy model modeled the entire building due to a central boiler and condenser water plant.

1
Fri Aug 31, 2012, 2:10 pm

sanitary installations within tenant fit-out

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Michael Haugeneder  on 

Hello all, Our current core&shell project does not include sanitary installations, which will only be built at tenant fit-out stage.

1
Fri Jul 27, 2012, 9:24 am

certification boundary

General forums
posted by  Michael Haugeneder  on 

Hello, I would like to ask some questions about the certification boundary. 1. A project of mixed use (retail+offices and hotel) is being certificated within 5 floors.

1
Thu Oct 4, 2012, 4:31 pm

natural ventilation in underground parking?

CS-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Michael Haugeneder  on 

Hello, is it possible to aim the credit IEQc5 if a project doesn't have a mechanical ventilation in the underground parking (UP)?

1
Sat Sep 1, 2012, 7:49 pm

single stream recycling

CI-2009 MRp1:Storage and Collection of Recyclables
posted by  Adam Targowski  on 

Will the requirements of this prerequisite be complied with only by having a waste storage room for the whole building with one container for a single stream recycling (that will accommodate all fi

1
Wed Jul 18, 2012, 4:30 pm

no change of flow fixtures

CI-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Adam Targowski  on 

We have a project that consists of an office space with toilets however the folw fixtures are not going to be changed. Is this project exempt from earning this prerequisite?

1
Fri Aug 31, 2012, 12:03 am

Wooden fire door - security requirement

CS-2009 MRc6:Certified Wood
posted by  Jose Antonio Kovacevic  on 

We are certifying a Core and Shell office building.

1
Fri Aug 31, 2012, 3:05 pm

Minimum drawdown rate calculation

EBOM-2009 SSc6:Stormwater Quantity Control
posted by  Meryl Corsun  on 

I am trying to verify that the cisterns on site release stormwater quickly enough to capture 2-year 24-hour design storm events by calculating the minimum drawdown rate.

1
Fri Nov 23, 2012, 9:11 pm

Location of the sign "You are entering a no smoking area"

NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Gail Shepherd  on 

We are using option 2 - prohibit on-property smoking within 25 feet of entries....The owner has asked if they can locate these signs on the building door.

1
Fri Jul 27, 2012, 7:32 pm

The AHPBC

General forums
posted by  Barry Giles  on 

Nice work Tristan. As you say at the end "what's next"? Well hopefully it continued discussion.

1
Wed Jul 25, 2012, 6:00 pm