Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Interpretations Database

General forums
posted by  Marcus Sheffer  on 

I was scanning a comment I made last year after the new database was released and wanted to offer some praise to the the current version.

0

Performance Requirements for Water Heating Equipment

NC-2009 EAp2:Minimum Energy Performance
posted by  Oliver Lange  on 

Hello, our project has 40 electrical table top water heaters. The electrical input is 2 kW and 5 liter storage. What is the right way for modeling the baseline builing water heating equipment?

1
Fri Jun 29, 2012, 6:13 am

Soil remediation

NC-2009 SSc3:Brownfield Redevelopment
posted by  Mark Meaders  on 

The definition of remediation as it relates to this credit is the process of cleaning up a contaminated site by physical, chemical, or biological means.

1
Fri Jul 6, 2012, 6:48 am

Planters

CS-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Gabriela Hernández Castillo  on 

We need to apply for the option 2 in our project since the 20% of the total site area is greater than the 50% of the site excluding the building footprint. According to the 20% requirement, we nee

1
Thu Aug 30, 2012, 7:45 pm

LEED Online Issues

leedonline.com access - is it possible???
posted by  Kalavati Mahajan  on 

Hello, I read all the treads below and also followed the system requirement guidelines at LEED online.com.

1
Fri Jun 29, 2012, 2:13 pm

If there is no new equipment/appliances

CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliances
posted by  Seung Shin Na  on 

I'm working on LEED CI project. I have asked client to list up the newly purchase equipment/appliances, but they have plan to use current ones after moving to new site.

1
Tue Jul 10, 2012, 5:33 pm

AC occupancy VS Default Occupancy

CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Esteban Martinez  on 

Is it mandatory to use the occupancy determined by the Air Conditioning Design (if available) instead of the Default Occupancy stablished at CS appendix 1?

1
Mon Jul 2, 2012, 8:01 pm

Treatment plant outside the LEED Boundary

CS-2009 WEc2:Innovative Wastewater Technologies
posted by  Gabriela Hernández Castillo  on 

We have a treatment plant that will treat to tertiary standar 100% of our wastewater. This treatment plant has two situations: 1. It will treat other buildings too 2.

1
Sat Jun 30, 2012, 10:18 pm

Offsite and Onsite Inquiry

EBOM-2009 SSc5:Site Development—Protect or Restore Open Habitat
posted by  Alfred Rosales  on 

Hi, Need your suggestion and expertise on this inquiry? We do have a land which we manage and maintain, this land is covered with native vegetation and is not within the project LEED boundary.

1
Sun Jul 1, 2012, 9:46 pm

Recycled materials

NC-2009 MRc7:Certified Wood
posted by  Albert Sagrera  on 

The recycled materials that are not counted in this credit, how to become certified? with the own label FSC or with a specific certificate? Thanks.

1
Fri Jul 13, 2012, 10:10 pm