Forum quick links
Tenant storage vs Host Building storage.
CI-2009 MRp1:Storage and Collection of Recyclablesposted by Luis Leal on
We separate the waste in 3 in the tenant space: organic, paper and recyclables.
WEp1 Retail NC – Process Water
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Maria Porter on
Hi, I need help with my first process water calculation. On LEED Online: What does “ADO” mean? Could it be “Annual Days of Operation” maybe?
Case 2
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by AAME User on
If the 62MZ calculator reveals that the critical zone is a zone with cooling only (with a min of 0), is that an appropriate reason to pursue Case 2?
About Table 1.Standard VOC Limits
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Albert Sagrera on
Hi, about the table 1. Standard VOC Limits, which values we might use, Ceiling Limit or Effective Date? Thank you,
Prescriptive approach - adjusting VLT for an overhang
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Ramana Koti on
Greetings all. One one of our LEED projects, we're using the prescriptive approach of VLT*WFR falling within the range of 0.15 and 0.18.
Dorm Rooms
EBOM-2009 IEQc2.2:Controllability of Systems—Lightingposted by American University on
We're pursuing EB:O&M on several campus buildings including residence halls, classroom buildings, and office buildings.
Air-tight Drywall Approach/Compartmentalization &Sprinkler Heads
posted by Kathy Kahill on
What are people doing out there for sealing quick-response sprinkler heads in mid-rise projects? I've been told that the gasket approach cannot be used with quick-response heads.
ID Credit for New Construction Projects
EBOM-2009 WEc1:Water Performance Measurementposted by Heather Holdridge on
Has anyone had any success using this as an ID credit for a new construction project?
Path 6
CI-2009 SSc1:Site Selectionposted by Nelina Loiselle on
Does anyone have a sample of a sequence of operations narrative? I am not sure what they'd like to see.
Entryways system disntance 10ft
CS-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by gabriel Morales on
Hello, architecture according to our main lobby, meeting with the distance of 10ft mat we complicated for users coming from the parking lots. The design team has proposed installing a section of