Forum quick links
Dormitory and Car/Van Pool Parking
CI-2009 SSc3.3:Alternative Transportation—Parking Availabilityposted by Andrew Lengel on
We are renovating the interiors of two existing dormitories on a college campus. Per LEED-CI SSc3.3 we fall under Case 2. We are not providing any new parking.
Can Interior vegetated areas in the ground floor be counted?
CS-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Sonia M. Miranda Palacios on
I´m working in a Project in Buenos Aires, Argentina, that is trying to achieve SSc5.1.
New Calculation Spreadsheet
CS-2009 IEQc8.1:Daylight and Views—Daylightposted by Yelena Gipsov on
Hello! I am working with the new Supplemental Daylight and Views Calculation Spreadsheet, prescriptive option. There is a column "Glare Control Type for spaces with VLT X WFR > 0.18".
hi
The project we´re working
CS-2009 EAc4:Enhanced Refrigerant Management
posted by Ismael Arroyo on
hi The project we´re working on will be cooled by coolling towers, so the tenants can have cooled water to install their own HVAC system.
Multiple Buildings
posted by Dhanujie Jayapala on
Hi, We are planning to apply LEED NC 2009 for a factory. It basically has the Factory and a facility building adjacent to it. There are other buildings like chreche, WWTP,waste storage area, secur
Baseline HVAC System for laboratory
CS-2009 EAp2:Minimum Energy Performanceposted by Yu Wang on
I am not clear about explanation from ASHRAE 90.1-2007 User’s Manual: 1. For laboratory spaces with a min.
No pesticides used during performance period
EBOM-2009 IEQc3.6:Green Cleaning—Indoor Integrated Pest Managementposted by Matthew Macko on
We are currently working on a project that used no pesticides during the performance period.
Path 6: Liscenced Professional Exemptions
CI-2009 SSc1:Site Selectionposted by Kara Hermann on
For path 6, Light pollution reduction, there used to be a "Streamlined Path (LPE)" - but I cannot find this option on the form. Does anyone know if this got taken away as an option?
PARKING BUILDING
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by LEED Pro Consultant on
Hello, I'm working on a project where 90% of the building (3 storeys high, 529 parking spaces) is a parking lot that covers the needs of different buildings next to it and 10% is a community centr
Constructions surrounding new data center in existing building
NC-2009 EAc1:Optimize Energy Performanceposted by Ross Farris on
I am working on a project that consists of an existing building which will be retrofitted and modeled as a major renovation under LEED BD+C.