precertification cost
posted by Lawrence Lile on
Does the fee for Precertification apply to the full certification, if this is done later? It looks like precertification will cost us $3250, whereas full certification would be $2250.
Central Plant Equipment Under scope of credit?
Pilot-Credits WEpc18:Appliance and process water use reductionposted by Janene Bolt on
We are looking into this credit for a restoration project at a Navy Yard.
Reappy for Certification on same building?
posted by Kerrie Kannberg on
Our project needs to close out and must submit the documentation to LEED for final construction.
0.125 gpf (1 pint) urinals: scale & pipe maintenance problems?
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Andrew Tse on
All urinals require maintenance and all urinals have scale buildup. With reduction of flow rates the potential for drain line scale build-up and pipe corrosion is increased.
EAp2 option 2 vs EAc1 Option 3
NC-2009 EAc1:Optimize Energy Performanceposted by Carl Sherman on
If we use option 2 for EAp2 can we use option 3 for EAc1 or do we need to be consistant throughout?
Previously Registered Project with New Team
posted by Shannon Allison on
We are working on a project that is going through redesign with a new project team. The project was registered during the original design. How do we assign the project to the new team?
Multifamily mid-rise and the IEQ prereq re: ASHRAE 62.2-2007
posted by Andrea Marzullo on
ASHRAE 62.2-2007 was required in the Florida Building Code in 2007.
Water Flow Diagram
Pilot-Credits PC25:Water Metering and Reportingposted by Donald Bauman on
This comment relates to Project ID: 1000012468 and try to comply with Pilot Credit 25 - Water Metering: •The credit requires us to submit a water flow diagram indicating all sources and uses of wa
Specific Forum
posted by Emily Catacchio on
Marco,
I'm not entirely sure what it is you're asking, would you mind clarifying so I can direct you to somewhere more specific on LEEDuser?
Thank you.
backup energy source
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
Hello. I’m dealing with the calculation method for the credits relative to EA section. I don’t understand the meaning of the following sentence of paragraph G2.4 of ANSI/ASHRAE/IESNA STANDARD