precertification cost

General forums
posted by  Lawrence Lile  on 

Does the fee for Precertification apply to the full certification, if this is done later? It looks like precertification will cost us $3250, whereas full certification would be $2250.

1
Wed Jul 4, 2012, 6:55 pm

Central Plant Equipment Under scope of credit?

Pilot-Credits WEpc18:Appliance and process water use reduction
posted by  Janene Bolt  on 

We are looking into this credit for a restoration project at a Navy Yard.

0

Reappy for Certification on same building?

General forums
posted by  Kerrie Kannberg  on 

Our project needs to close out and must submit the documentation to LEED for final construction.

1
Mon Apr 16, 2012, 6:10 pm

0.125 gpf (1 pint) urinals: scale & pipe maintenance problems?

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Andrew Tse  on 

All urinals require maintenance and all urinals have scale buildup. With reduction of flow rates the potential for drain line scale build-up and pipe corrosion is increased.

1
Fri Apr 6, 2012, 4:22 pm

EAp2 option 2 vs EAc1 Option 3

NC-2009 EAc1:Optimize Energy Performance
posted by  Carl Sherman  on 

If we use option 2 for EAp2 can we use option 3 for EAc1 or do we need to be consistant throughout?

1
Wed Apr 4, 2012, 7:51 pm

Previously Registered Project with New Team

General forums
posted by  Shannon Allison  on 

We are working on a project that is going through redesign with a new project team. The project was registered during the original design. How do we assign the project to the new team?

1
Fri Apr 6, 2012, 4:46 pm

Multifamily mid-rise and the IEQ prereq re: ASHRAE 62.2-2007

LEED for Homes (LEED-H) Forum
posted by  Andrea Marzullo  on 

ASHRAE 62.2-2007 was required in the Florida Building Code in 2007.

1
Fri Apr 6, 2012, 11:41 am

Water Flow Diagram

Pilot-Credits PC25:Water Metering and Reporting
posted by  Donald Bauman  on 

This comment relates to Project ID: 1000012468 and try to comply with Pilot Credit 25 - Water Metering: •The credit requires us to submit a water flow diagram indicating all sources and uses of wa

1
Thu Apr 5, 2012, 4:48 pm

Specific Forum

General forums
posted by  Emily Catacchio  on 

Marco,

I'm not entirely sure what it is you're asking, would you mind clarifying so I can direct you to somewhere more specific on LEEDuser?

Thank you.

1
Wed Apr 11, 2012, 12:49 pm

backup energy source

NC-2009 EAp2:Minimum Energy Performance
posted by  Francesco Passerini  on 

Hello. I’m dealing with the calculation method for the credits relative to EA section. I don’t understand the meaning of the following sentence of paragraph G2.4 of ANSI/ASHRAE/IESNA STANDARD

1