Forum quick links
Concrete Recycling
NC-2009 MRc2:Construction Waste Managementposted by matthew convery on
Well I've read through the current posts and can't find the following discussed: We have a good amount of clean concrete and CMU we've demolished off an addition, we intend to use as much of the
Near Airfield
NC-2009 IDc1:Innovation in Designposted by David Menk on
Our project is located across the street from a military airfield.
"Stub-outs" and future development (NPDc6)
posted by Eric Orozco on
Greetings all, My project is surrounded by adjacent development/redevelopment opportunities - all of which will in time be redeveloped to connect to our street and pedestrian grid, but probably n
Increase in Fundamental Scope...
posted by Scott Bowman on
From my reading of the Fundamental Commissioning credit, it now includes a peer review (but with very little detail) and a Peer Review (Current Facilities Requirements and Operations and Maintenanc
Commissioning of Systems not required in prereq
NC-2009 IDc1:Innovation in Designposted by Shauna Sproul on
I am wondering if Innovation & Design Credits can be earned for commissioning systems that are not in the prerequesite, for example the building envelope? I know credits can be earned in 2012 u
Density Lighting Exterior
CS-2009 EAp2:Minimum Energy Performanceposted by gabriel Morales on
Hi, we have any questions about the desnsity lighting exterior: 1.- The building is located on a corner in one of the main streets of Mexico City, the architectural design has 23 terraces which wil
Exceptional Calculation for Elevator
NC-2009 EAp2:Minimum Energy Performanceposted by Thomas Hellmann on
My read on ASHRAE-90.1 and numerous forums, is that USGBC may allow for an exceptional calculation to be performed for elevator energy savings, provided that; 1) Schedule of operation remains the s
Only one room non-densely occupied
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Christian Brücher on
Hi, following situation: We have a ventilation system which serves only densely occupied spaces except one small office room for one person which is occupied perhaps 1-2 hours a day (so I would ca
No. The 1/2 mile radius
posted by Susan Walter on
No. The 1/2 mile radius includes what it includes.
2012 & the Credentialing System
posted by dia2000@gmail.com dia2000@gmail.com on
What are the impact of these changes on the requirements & content of the LEED Green Associate exam? Do these changes have any impact on the LEED Credentialing exams??