Concrete Recycling

NC-2009 MRc2:Construction Waste Management
posted by  matthew convery  on 

Well I've read through the current posts and can't find the following discussed: We have a good amount of clean concrete and CMU we've demolished off an addition, we intend to use as much of the

1
Tue Mar 13, 2012, 8:40 pm

Near Airfield

NC-2009 IDc1:Innovation in Design
posted by  David Menk  on 

Our project is located across the street from a military airfield.

1
Fri Apr 6, 2012, 8:09 pm

"Stub-outs" and future development (NPDc6)

General forums
posted by  Eric Orozco  on 

Greetings all, My project is surrounded by adjacent development/redevelopment opportunities - all of which will in time be redeveloped to connect to our street and pedestrian grid, but probably n

1
Tue Mar 13, 2012, 11:37 pm

Increase in Fundamental Scope...

General forums
posted by  Scott Bowman  on 

From my reading of the Fundamental Commissioning credit, it now includes a peer review (but with very little detail) and a Peer Review (Current Facilities Requirements and Operations and Maintenanc

0

Commissioning of Systems not required in prereq

NC-2009 IDc1:Innovation in Design
posted by  Shauna Sproul  on 

I am wondering if Innovation & Design Credits can be earned for commissioning systems that are not in the prerequesite, for example the building envelope? I know credits can be earned in 2012 u

1
Wed Mar 14, 2012, 1:32 pm

Density Lighting Exterior

CS-2009 EAp2:Minimum Energy Performance
posted by  gabriel Morales  on 

Hi, we have any questions about the desnsity lighting exterior: 1.- The building is located on a corner in one of the main streets of Mexico City, the architectural design has 23 terraces which wil

1
Thu Mar 15, 2012, 1:08 pm

Exceptional Calculation for Elevator

NC-2009 EAp2:Minimum Energy Performance
posted by  Thomas Hellmann  on 

My read on ASHRAE-90.1 and numerous forums, is that USGBC may allow for an exceptional calculation to be performed for elevator energy savings, provided that; 1) Schedule of operation remains the s

1
Wed Mar 14, 2012, 3:56 pm

Only one room non-densely occupied

NC-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  Christian Brücher  on 

Hi, following situation: We have a ventilation system which serves only densely occupied spaces except one small office room for one person which is occupied perhaps 1-2 hours a day (so I would ca

0

No. The 1/2 mile radius

General forums
posted by  Susan Walter  on 

No. The 1/2 mile radius includes what it includes.

0

2012 & the Credentialing System

General forums
posted by  dia2000@gmail.com dia2000@gmail.com  on 

What are the impact of these changes on the requirements & content of the LEED Green Associate exam? Do these changes have any impact on the LEED Credentialing exams??

0