Pilot Credit 43 ISO 14044
Pilot-Credits PC43:Certified Productsposted by Bruce Maine on
The USDA Forest Products Lab generated an EPD in conformance with ISO 14044. Would this generic, non-product specific documentation qualify for Pilot Credit 43 or LEED 2012?
Regional Materials - raw material
NC-2009 MRc5:Regional Materialsposted by Felipe Duran on
Hello, we are working on a project that aims to get the LEED NC-2009 certification. We used a stone removed from the site to compose some walls, and therefore has no cost.
Hallways in Multi Family
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Joseph Blanco on
Can anyone tell me if Hallways would be included in a multifamily scenario. Typically this lighting is always on or on a timer.
Using a water table tank as a retaining method for compliance
CS-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Gabriela Hernández Castillo on
Our project is capturing rainwater and sending it to a water table tank (I don't know if this is the correct term, it is the tank that recieves water from the water table below foundations). The t
Polished Plaster (Armourcoat Perlata) Categorization in LEED
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by mary ostafi on
I recently spent a great deal of time trying to determine where a polished plaster product (Armourcoat Perlata) falls into LEED.
HVAC Protection
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Patana Rattananavathong on
I have a project that don't use any HVAC system. It's all natural ventilation. Is it ok to left the HAVC protection out since there is nothing to protect.
Unable to Meet Pre-req during Current Performance Period
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Kristofer Kiszynski on
I was wondering what would happen if we failed to meet a prerequisite such as IEQp1. Would we need to restart our performance period after correcting whatever it is that needs to be corrected?
LEED for Homes - OPR ?
posted by Mike Barker on
While it is not required officially by LEED for Homes ( i think ?
viscose
CI-2009 MRc6:Rapidly Renewable Materialsposted by Giselle Walsh on
If a product has cotton and viscose blend, can I the entire product be considered rapidly renewable or just the cotton portion?
PI Form 3 - Occupant and Usage Data
posted by David Groseclose on
Question was posted - I seem to be having trouble with this form. it continues to state that the form is not complete. Answer- Make sure all of the boxes that are blank have a zero in them.