posted by Eric Lindstrom on
We are concerned that the 3-17 points that go to this credit may be too steep. Are there numbers on how many LEED ND's exist?
Discovery and Implementing Synergies credits could drive some re
posted by Jim Newman on
I am pretty intrigued by how the first two IP credits have evolved to require setting of performance areas for consideration and then setting up tracking of that performance (in the Implementing Sy
Doubt
CS-2009 EAp2:Minimum Energy Performanceposted by Redy Truccolo on
Hi, I'm doing a LEED CS 2009 PRE-certification. My question is: In the "Upload L-4" section, which states: Provide a detailed narrative describing the intended credit approach, including energy ef
Re:Regional Priority Credit
posted by David Posada on
I had to look for it, too - In the v3 LEEDOnline scorecard, the fourth column is labeled "RP" at the top and a magnifying glass icon appears next to the regional priority credits based on the zip c
View outside vision glazing, LEED CI 2.0 project.
CI-2009 IEQc8.2:Daylight and Views—Views for Seated Spacesposted by Rubén M. R. on
Hi all, Since I couldn't find a LEED CI 2.0 forum, I allow myself to write here (my apologies): The vision of a multi-occupant office goes directly to a terrace which has a high wall located 10
Min Airflow in Intermittent Occupancy Spaces
CI-2009 IEQp1:Minimum IAQ Performanceposted by Rick Servoss on
We received a comment back on a CI project stating: "Demonstrate the system serving the special occupancy space is capable of modulating system and zone minimum supply volume below 0.30 cubic feet
IP Credit: Discovery
posted by Mark Campbell on
This credit is a very good addition. A lot of LEED projects today aren't doing these types of studies and they are very valuable. Consider associating a time frame for this credit.
IP Credit: Implementing Synergies
posted by Mark Campbell on
This credit should be required to be documented in fundamental commissioning Basis of Design document.
EA Credit: Optimize Energy Performance
posted by Mark Campbell on
Add a process chart to explain the simulations that have to be performed, the time they have to be performed in design, and if they can be used to satisfy IPc1 - Discovery.
PF: Fundamental Commissioning & Verification
posted by Mark Campbell on
The layout of commissioning is based around design-bid-build model and not an integrative design or design-build delivery. This creates either a loophole or exception for achieving the prereq.