Forum quick links
WEc2 Regional Priority Credit
EBOM-2009 RPc1:Regional Priorityposted by Kevin Wilcox on
I have a EBOM project where we have provided documentation for WEc2 and have exceeded the threshold for the RPC.
Development footprint exceeding previously developed
posted by Ricardo Sobral on
LTprerequisite1- Case 1- What happens is the new development footprint exceeds the previously developed portions of the site?
LEED Certification for Phase wise construction
posted by Ramesh Narayanan on
I have few clarification of whether the old constructed portion material should be considered for all the materials credits. The building has been developed by the developer which including the st
Tenant build-out
CS-2009 EAp2:Minimum Energy Performanceposted by Marco ZM on
We are in the process of modelling/simulating of office building in LEED C&S 2009 for EAp2 and EAc1 – Option 1. Building is divided into two parts: owner occupied space and offices for rent.
WATER USE REDUCTION
CI-2009 WEc1:Water Use Reductionposted by sajeev john on
DOES THE COMMON TOILEST IN A FLOOR COME UNDER TENANT SCOPE? ENTIRE FLOOR IS OCUPIED BY SAME COMPANY? FLOOR IS MEANT TO BE RENT TO DIFFERENT TENANATS AND OUR COMPANY IS OCCUPYING THE ENTIRE FLOOR?
Shading devices vs daylighting
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Rudolph Schaar on
ASHRAE 189.1, 8.4.1.2 requires us to have permanent shading devices. We are attempting to achieve the Daylighting credit 8.1.
IIC in IEQc9
Schools-2009 IEQc9:Enhanced Acoustical Performanceposted by Gary Madaras on
Just want to double check . . . As far as I can see, there are no IIC requirements in IEQc9. Can someone confirm please? Thanks.
Garage and technical rooms
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by BH . on
Hello, We are dealing with project with underground garage, where adjacent spaces are technical rooms. Can we transfer the air from the garage to the technical rooms to ventilate them?
Green wall in a Lobby
CS-2009 IDc1:Innovation in Designposted by Anna Korinkova on
Hi, Our project team would like to use a green wall placed in our office building's atrium as an innovation in design credit.
Refrigerant Management Plan
EBOM-2009 EAp3:Fundamental Refrigerant Managementposted by Chris Munn on
Does anyone know of a good resource to use as a template for developing a refrigerant management plan for a building?