Forum quick links
Existing Fixtures Calculated in Installed Lighting Power?
CI-2009 EAc1.1:Optimize Energy Performance—Lighting Powerposted by David Rodriguez on
I have a renovation project where there are three rooms in which we are not replacing the light fixtures.
Tenant area commissioning
CS-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by sompoche sirichote on
Our project is an office building with 10 floors on the top are leased out as a hotel tenant and we are seeking for LEED CS certified. If the mechanical and electrical plant of the hotel are separa
Baseline HVAC Equip Vs. Proposed HVAC Equip
NC-2009 EAc1:Optimize Energy Performanceposted by Greengrade User on
Question: Does the HVAC system for the baseline have to be the same type as the proposed design HVAC equipment? (ie.
Asphalt Roll Roof Recycling
CI-2009 MRc2:Construction Waste Managementposted by Sabrina B on
I am working on a existing building renovation. The existing roof, which will be demo'd, is asphalt roll with batt insulation underneath.
CI on site Green Power?
CI-2009 EAc4:Green Powerposted by Robin Hurt on
Is it possible to install onsite renewable energy that met the energy production requirements for energy usage of CI EA4 in lieu of purchasing Green Power?
Hi, I have a project in the
EBOM-2009 WEc3:Water Efficient Landscapingposted by matthew strong on
Hi, I have a project in the NY zip code 10589 that has two types of irrigation: 1. Unmetered irrigation by retention pond for 58,094 SF of lawn and trees along the driveway 2.
M&V- energy costs paid by tenant
CI-2009 EAc3:Measurement and Verificationposted by Sarah Marvez on
Our project occupies
PV Watts for other countries?
NC-2009 EAc2:On-Site Renewable Energyposted by Nelina Loiselle on
Help Please!
Responsible Sourcing of Raw Materials
posted by Anne Less on
Intent: "To protect ecosystems, respect cultural and community values, and improve land use through responsible sourcing of raw materials used for building products." The requirement for mined or
Foyer as occupided or unnocupied space
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by marisol cano on
Hello, Anybody knows if a Foyer in a Hotel (mainly a hall to access 3 meting rooms with a "coffe and cookies" table for the meeting room users) would count as occupied space?