Forum quick links
calculation assumptions
Pilot-Credits PC1: Life-Cycle Assessment (LCA) of Building Assemblies and Materialsposted by Susan Walter on
Now that we're digging into the credit, we have questions on the assumed thickness for items that are a SF input.
LEED for Homes - MR 2.2
posted by Natalie Connor on
This is my first time working on a LEED project for a residential construction company and I'm trying to finish up the final paperwork (basically the MR 2.2 section).
Green Advantage Innovation Credit for 2009 BD&C & NC v2.2
NC-2009 IDc1:Innovation in Designposted by liz boastfield on
Projects staffed with 30% or more of key personnel certified through Green Advantage are now eligible for award of 1 Innovation point.
Total Cost of Materials
NC-2009 MRc4:Recycled Contentposted by J Morrison on
The LEED Online format for submitting the MR credit 4, 5, and 7 it asks for the "Cost per Item" and "Number of Items Purchased". I have to total cost of the items, but not the individual cost.
Energy Modeling
CS-2009 EAp2:Minimum Energy Performanceposted by Yolanda Sanchez on
In a LEED CS 2009 building energy simulation we are modeling the building envelope to test performance (only the building envelope).
HVAC System
CS-2009 EAc4:Enhanced Refrigerant Managementposted by Yolanda Sanchez on
HVAC for the whole building is in the process of being designed (VRF system).
Earning Certs within 5 years
posted by Barry Giles on
I presume that this is a new construction project that is currently in the process of design and will be built with a possible completion date of 5 years hence...or more.
HangarGrip Adhesive
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Elizabeth Powers on
The product in question is the Eco Hanger Grip Adhesive from MEI, described as "a construction-type paste adhesive specially designed for bonding insulation hangers to metal ducts and unfinished ma
Scheduling for CS
CS-2009 IEQc3:Construction IAQ Management Plan—During Constructionposted by BH . on
Dear all, we are making Core Shell project. Is it necessary to take into consideration flush out procedure during preparation of IAQ management plan in scheduling point?
Are garage areas counted?
EBOM-2009 IEQc3.2:Green Cleaning—Custodial Effectiveness Assessmentposted by Paola Figueiredo, Newton Figueiredo on
To whom it may concern, I have a question that I did not find a solution to in the LEED EBOM Reference Guide or in the credit-by-credit forum on this website. In the audit that will be made in the