Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

EPD Option 2: Optimization

NC-v4.1 MRc2:Environmental Product Declarations
posted by  Laura Ribeiro  on 

Hello everyone,

I am using some products that already have 2 versions of EPDs, and in the new version there is a table with the differences in relation to the previous EPD.

0
8
Project Manager, Architect
PGAL
LEEDuser Basic Member
0 thumbs up
Wed Jul 17, 2024, 5:56 pm

Joint Compound and Joint Tape - GREENGUARD Gold requirements

NC-v4.1 EQc2:Low-Emitting Materials
posted by  Jason Biondi  on 

Here is the technical advice we receive for one of the project:

8
Wed Jul 17, 2024, 5:50 pm

Hard-lid ceiling with access panel

NC-v4 EQc1:Enhanced indoor air quality strategies
posted by     on 

For interior cross-contamination prevention - Has anyone successfully submitted a project with an access panel in a hard lid ceiling?

0
8
Tue Jul 16, 2024, 1:56 am

How to model process chilled water load?

NC-v4 EAp2:Minimum energy performance
posted by  Eric Dixon  on 

My proposed design for lab utilizes a heat recovery chiller connected to geo-exchange. There is a 40 ton process chilled water load on the heat recovery chiller.

1
Thu Jul 18, 2024, 1:46 pm
3
Default Avatar
Energy Consultant - LEED AP BD+C
ECOPENTA
LEEDuser Basic Member
3 thumbs up
Mon Jul 15, 2024, 7:11 pm

Maximum Distance from Parking to Site

NC-v4 LTc7:Reduced parking footprint
posted by  Laraib Raza  on 

Hello All LEED Users,My question is what is the maximum distance allowed from the building(site) to parking? If the Parking is located outside of the site boundary?

0

*time sensitive* Presidential election advocacy opportunity

Green Commons
posted by  Clark Brockman  on 

Greetings to all of the sustainability leaders in the Green Commons!

5
Owner
Brockman Climate Strategies
LEEDuser Basic Member
0 thumbs up
Fri Jul 12, 2024, 2:29 pm