Forum quick links
High-rise towers
Pilot-Credits PC23:Quality Viewsposted by Elena Verani on
Would a high-rise tower be compliant with credits requirements? From the upper floors one would only see the sky outside vision glazing. Would this be enough?
Restroom ventilation
NC-2009 IEQp1:Minimum IAQ Performanceposted by Alexia Anastassiadis on
We are working on a major renovation project and the restrooms have natural ventilation. Do we have to provide additional mechanical exhaust to comply with ASHRAE?
CS projects should have 75% of GFA to earn this credit?
EBOM-2009 SSc1:LEED Certified Design and Constructionposted by Bazeeth Ahamed Khader Mohamed Ali on
75% of "leasable area" makes more sense here. How do we communicate our suggestions to USGBC. Kindly let me know if there is a way.
Industrial Plant Manufacturing Hall Ventilation
NC-2009 IEQp1:Minimum IAQ Performanceposted by Sustainability Provider on
We are currently working on the design of an industrial plant (aluminum casting in specifics) with two sections - manufacturing hall and administrative/engineering offices.
New LEED CI Project information form
posted by Susann Geithner on
We have just started a new LEED CI project on LEED Online.
Energy Star Space Allocation
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Ed Okon on
Good Afternoon I'm currently composing a plan for LEED EB on an existing manufacturing campus comprised of multiple building types (warehouse, shipping and receiving facility, manufacturing, office
Sample Calculations
NC-2009 WEc2:Innovative Wastewater Technologiesposted by Craig Phillips on
I am finding it hard to locate a 1.0 or a dual flush 1.6/.8 toilet and flushometer. Where did the data come from in the sample calculations? Lyn
WEp1 - Annual Days of Operation
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by susan eguia on
Hi, Can someone please clarify what is the LEED definition for annual days of operation - is it no. of building operated in a year? Appreciate any assistance. Thanks, Susan
Off site water storage
EBOM-2009 SSc6:Stormwater Quantity Controlposted by Prudence Ferreira on
Our project site is a winery that directs stormwater to ponds which are later used for irrigation. The only thing is that the ponds are sometimes considerably distant from the LEED building.
Tobie, yes, you'll need to
posted by Tristan Roberts on
Tobie, yes, you'll need to meet them.