Forum quick links
EZ
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Cheryl Burkinshaw on
I am working on a small project with a design team that is fairly new to LEED.
Electric Shower
NC-2009 EAp2:Minimum Energy Performanceposted by SW LEE on
Our project is at South East Asia, do we need to comply to ASHRAE 90.1 on electric shower?
LEED Exam question
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Farah A. on
A new office project will have 200 employees and anticipates an estimated 30/visitors a day. During peak periods, the building will be occupied by 210 occupants.
SSp1 / ESC plan and the Multi-Building Campus Guidance
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Laura Billings on
Hi there - I'm working on a 4-building office campus that is being developed all in one phase.
T2, T4, T6
Healthcare-v2009 MRp2:PBT source reduction - mercuryposted by Gustavo De las Heras Izquierdo on
This credit does not allow installing T9, T10 or T12 fluorescent lamps. This credit provides a criteria to specify T5 and T8 fluorescent lamps. Are there any requirement for T2, T4 and T6 fluores
Mech. exhaust fans required for a naturally ventilated project?
CS-2009 IEQp1:Minimum IAQ Performanceposted by Ron Dean on
I'm working in a small project with natural ventilation overall. Considering these 3 facts: 1. LEED states to comply with sections 4-7 of ASHRAE 62.1-2007. 2.
LEED CI 2009 M&V metering requirements
CI-2009 EAc3:Measurement and Verificationposted by Patrick Salmon on
Our company is in the process of determining whether a commercial interiors project is ideal for the EAc3 submetering option for Case 1.
Tenant space fan & pump sizing
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Mike D on
We are a bit confused as to the meaning of space fan and pump sizing? Could anyone please offer some clarification? Thanks!
Dormitories - LEED NC?
posted by Maya Karkour on
Hi All, This international project consists of several 3 stories dormitories.
Air flow measurement for non densely occupied zones
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Magda Aghababyan on
Dear Sir/ Madam, I have a project that is a hotel with 200 guest rooms that are non-densely occupied. Each guest room floor (20 rooms per floor) is supplied with 3 AHUs.