Forum quick links
Shuttle takes 10min or less to get to the first bus stop
NC-2009 SSc4.1:Alternative transportation - public transportation accessposted by Marcio Alberto Casado Pereira on
Hi, I was wondering if I can get this credit if my shuttle stops at a bus stop 10min or less after it departs from the project.
Durable Goods - Furniture
EBOM-2009 MRc2:Sustainable Purchasing—Durable Goodsposted by Sabrina Cescolini on
We are working with a project building that is a large convention center and event hall, with some permanent offices. For MRc2.2.
MPR 6 Compliance through a different Portfolio manager
posted by Vinsu Shah on
In regards to what was briefly discussed in the Q&A portion, will LEED accept access to a different portfolio manager instead of the Energy Star Portfolio Manager?
Sealant VOCs
NC-2009 IEQc4.1:Low-emitting materials - adhesives and sealantsposted by Erin Holdenried on
For a product that "does not contain isocyanates, silicone, solvent or acids" does this mean there are 0 VOCs? Or are there other compounds that could be present that contain VOCs?
How do I calculate?
NC-2009 WEp1:Water use reductionposted by adi ashkenazi on
Hello I'm working on an exclusive residential project (NC) that contains a resident- only-access pool and gym. In my calculations I considered around 1400 residents and about 10 staff.
Use of "Offsite" sources of nonpotable water
NC-2009 WEp1:Water use reductionposted by Ahmed Mosa on
i understand the focus of the credit is water efficiency of the installed fixtures but can "Offsite" sources of nonpotable water such as captured rainwater, graywater, air conditioner condensate, c
Does LEED look at the overall budget only or at each fixture?
NC-2009 WEp1:Water use reductionposted by Ahmed Mosa on
In one of our projects " a Hotel " the client is keen to use water-saving fixtures but not Shower-heads, can we exceed the baseline in this fixture but balance it with others to achieve the 20%?
Feel like being penalized by not providing carpark on site
CS-2009 SSc4.4:Alternative transportation - parking capacityposted by William Wong on
There are quite some LEED credits relate to carpark provisions within project building. Obvious those are SSc 4.3, SSc 4.4 and SSc 7.1.
100% Green energy supply contract
CI-2009 EAc4:Green powerposted by Esther Izquierdo on
Hi, After reading all comments I'm still not clear about the following, I hope you can help me: - We have not gone through the building simulation route in EAC1.3, so in principle we would need to
The building will provide
NC-2009 IEQc5:Indoor chemical and pollutant source controlposted by Mike D on
The building will provide entrance mats for all major entrances. The building have retail units at the ground floor. Do each of those units have to have mats as well?