Topic | Recent |
---|---|
Number of Reviews AllowedNC-v4 INc1: Innovationposted by Cindy Quinn on Feb 26, 2021, 2:03 pm
All innovations are now lumped under INc1. If I submit INc1 with a couple strategies in the design preliminary review, and respond to comments in the design final review, will I still be able to... Last reply: Cindy Quinn, Feb 26, 2021, 3:54 pm |
|
Elevators in the ProposedNC-v4.1 EAp2: Minimum Energy Performanceposted by Isabel Santos on Feb 26, 2021, 2:59 pm
I am currently computing the elevators' energy consumption in the baseline according to Table G3.1, section 16. After assessing the total peak elevator motor power per car, as Design Builder (... |
|
VOC content for wet applied adhesiveNC-v4 EQc2: Low emitting materialsposted by Muhammad Al Mahasneh on Feb 17, 2021, 11:52 am
Hello, we are evaluating an onsite wet-applied adhesive that has report of... Last reply: Debra a. Lombard, Feb 26, 2021, 12:56 pm |
|
Energy Star Ratings for AppliancesLEED v4.1 Discussion Forumposted by Jeremy Smith on Feb 26, 2021, 11:27 am
Can anyone advise what is the Energy Star rating criteria for a Network Switch Power Supply, or does this device fall outside of the Energy Star Rating requirements and can therefore be excluded... |
|
LEED v4 Core & Shell ACP as a result of COVID.Working through COVID-19posted by David Hubka on Feb 26, 2021, 11:24 am
there is an ACP available for CS projects that experience diffulties signing tenants as a result of COVID. If the project team ask... |
|
Walkscore only for a few countries?NC-v4.1 LTc4: Surrounding density and diverse usesposted by Maria Porter on Feb 25, 2021, 5:19 am
I investigated the new option 3 for this credit. The only information required is a screenshot of the Walkscore. That seems a lot easier than showing... Last reply: Deborah Lucking, Feb 26, 2021, 11:11 am |
|
Wall sconce under overhang/canopyNC-v4.1 SSc6: Light Pollution Reductionposted by Jack Ma on Feb 17, 2021, 6:33 pm
Working on a project where the wall sconce will be installed under the building's overhang and canopy. This will not light up the sky. Is there a specific way of calculating the reduced (... Last reply: Bill Swanson, Feb 26, 2021, 10:02 am |
|
MRc2 BPDO EPD Option 2 Multi Attribute OptimizationNC-v4.1 MRc2: Building product disclosure and optimization - environmental product declarationsposted by Sarah Linke on Feb 24, 2021, 3:24 pm
Has anyone had success pursuing credit for the BPDO EPD Option 2 (Multi Attribute Optimization)? The companies I have had success finding documentation for are as follows: Owens Corning (... Last reply: Tommy Linstroth, Feb 26, 2021, 8:40 am |
|
dry shampooerEBOM-2009 IEQc3.4: Green Cleaning—Sustainable Cleaning Equipmentposted by cathy keagle on May 7, 2015, 11:50 am
What category does a dry shampooer fit into? Last reply: alexa ben, Feb 26, 2021, 2:06 am |
|
General Emissions Evaluation criteria for flooring assemblies assembled off-siteNC-v4 EQc2: Low emitting materialsposted by Jeff Wiedmeyer on Feb 24, 2021, 1:41 pm
I've read through the posts related to this subject but for laminating adhesives and millwork. My question is similar but pertains to the requirement for a flooring... Last reply: Megan Leslie, Feb 25, 2021, 7:57 pm |