Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Distance calculation

EBOM-2009 MRc5:Sustainable Purchasing—Food
posted by  Magda Aghababyan  on 

Hi, In a situation where we buy a certain product from a retail supplier who is within the 100 mile radius, but the actual manufacturer is outside that limit is it still possible to pursue this cre

2
Instrumentation and Control Engineer / LEED AP BD+C
Dar Al Handasah
LEEDuser Basic Member
4 thumbs up
Wed Jul 31, 2013, 4:23 pm

Period & time of Breakdown

EBOM-2009 EAc3.2:Performance Measurement—System-Level Metering
posted by  Alexa Stone  on 

Hi all, I'm confused about when OR over what period of time does the breakdown need to capture. I understand that it needs to roll up to the EAc1 declared annual energy use (mbtu).

3
Default Avatar
ecoPreserve: Building Sustainability
LEEDuser Basic Member
101 thumbs up
Wed Jul 31, 2013, 4:13 pm

Effective Daylit Zones

NC-2009 EAp2:Minimum Energy Performance
posted by  Maya Karkour  on 

Dear All, I want to model daylighting sensors for an open plan office.

3
Default Avatar
EcoConsulting
LEEDuser Basic Member
549 thumbs up
Wed Jul 31, 2013, 3:57 pm

Calculating Accurate FTE Value

Calculating FTEs
posted by  Elizabeth Felder  on 

The project is a high rise commercial building, going for EBOM certification. The number we have for FTEs is outdated, as of about a year ago.

3
Wed Jul 31, 2013, 3:33 pm

Multi-occupant space with workstations

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Courtney Royal  on 

I have a space in a University Commons building which will be used primarily as a meeting, planning space.

3
Wed Jul 31, 2013, 2:42 pm

Green-e certified equivalence

CS-2009 EAc6:Green Power
posted by  Ai Engineering  on 

Good day, I'm working on a Core and Shell project in Switzerland and I'm trying to achieve the Credit for "Green Power" but the utility company is Naturamade certified and, after checking the Gree

7
Wed Jul 31, 2013, 1:35 pm

urban farm

EBOM-2009 SSc5:Site Development—Protect or Restore Open Habitat
posted by  Emmanuel Pauwels  on 

Would a vegetable garden count for this credit?

3
Tue Jul 30, 2013, 7:27 pm

Mixed Use Buildings

NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfort
posted by  Donald Green  on 

How are mixed use buildings seen with regard to number of T-stats. About 80% of the building is a Dorm with about 20% being a 2 story office wing.

3
Sr Project Manager / Operations Manager
Progressive AE
LEEDuser Basic Member
25 thumbs up
Tue Jul 30, 2013, 7:22 pm

Does Bill of Lading enough as supporting doc?

EBOM-2009 MRc2:Sustainable Purchasing—Durable Goods
posted by  Katherine Ann Resurreccion  on 

From the the ACP for Regional Materials, it says "Products shipped by rail or water have been extracted, harvested or recovered, as well as manufactured within 500 miles total travel distance of th

3
Tue Jul 30, 2013, 5:35 pm

Exhaust Requeriments with Natural Ventilation

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Hector Miranda  on 

hi all, Can you meet the prerequisite using paragraph 5.1 (Natural ventilation) from Standard 62.1-2007 for areas that require exhaust system (i.e. toilets, kitchens, etc.)? Thanks!

4
Default Avatar
President
Weatherby Design & Co. Engineers
LEEDuser Basic Member
67 thumbs up
Tue Jul 30, 2013, 3:00 pm