Historical data with building and tenant changes
EBOM-2009 IOc3:Documenting sustainable building cost impactsposted by Tiffany Moore on
I'm trying to clarify how or what to provide in terms of historical data for an O+M project with a performance period that will begin at day 1 of occupancy in an NC project.
AGMBC Part 2
posted by Diana Carro on
Hello. Do you know when LEED Online functionality and Certification (and Registration) Fees will be available for Part 2 of the AGMBC? Thanks!!
Chilled Water Pumps, Primary/Secondary
NC-2009 EAp2:Minimum energy performanceposted by Aaron Dahlstrom on
ASHRAE 90.1-2007 Sec G3.1.3.10 requests that users specify pump power of 22 W/gpm, with a primary / secondary pumping system and variable flow on the secondary side.
RAVOCs
NC-2009 IEQc4.2:Low-emitting materials - paints and coatingsposted by Eduardo Guzman on
Our contractor would like to use a flat pain that gives both a VOC content measurement and a RAVOC content measurement.
Floodlight
NC-2009 EAp2:Minimum energy performanceposted by Ameet AA on
2. Lighting requirement from ASHRAE 90.1-2007 Appendix G?
Can I use CONTROL as an energy saving strategy??
CS-2009 EAp2:Minimum energy performanceposted by Esteban Undurraga on
Dear all: We have an specific question related to the Whole Building Simulation of an office Building. The electricity distribution company established a maximum limit of energy use for the buil
Detailed Plant Simulation
CI-2009 EAc1.3:Optimize energy performance - HVACposted by Chilufya Lombe on
Hi, we have a project with a certain number of 'back up' systems for air conditioning.
Can the Technical Controller on the project be the CxA as well?
NC-2009 EAc3:Enhanced commissioningposted by Maya Karkour on
Hello, We are working on a project which seeks to achieve EA c3.
Core Shell Version 2.0
CS-2009 EAp2:Minimum energy performanceposted by Carolina Vergnano on
Hello, I would like to know if on the old version, using the energy simulation based on Std.90.1-2004 Appendix G, to comply with the prerequiste the proposed needs at minimum to be equal to the Ba