Forum quick links
IAQ strategies for industrial projects should continue to be included in IEQ category
posted by Alison Rosso on
I represent Jacobs, a global design firm that performs architectural and engineering design for a multitude of industrial manufacturing project types (semiconductors, pharmaceuticals, EV battery ma
Project Occupancy when we are only complying with Indoor Water Use Reduction prerequisite under prescriptive path?
CI-v4 WEp1:Indoor water use reductionposted by Edgar Arevalo on
So we have an interior fit out project where we can only comply with the Indoor Water Use Reduction prerequisite and not the credit. Since we are only complying with the prerequisite via
LEED v5 IAQ
posted by Annie Ingraham on
With respect to the USGBC goal of using more broad language, the most sustainable building equipment, are those that function optimally for the longest period of time. Adding 10 line
ID+C Fundamental Air Quality
posted by Annie Ingraham on
With respect to the USGBC goal of using more broad language, the most sustainable building equipment, are those that function optimally for the longest period of time. Adding 10 line
LEED v5 IEQ
posted by Annie Ingraham on
With respect to the USGBC goal of using more broad language, the most sustainable building equipment, are those that function optimally for the longest period of time. Adding 10 line
Building Product Disclosure and Optimization, Additional Resources (Table 2): Product Documentation Multi-Attribute Scoring
posted by Michael Scharpf on
Propose to adding CSC to the eligible certifications in this section, with applicability across Climate Health, Human Health, Circular Economy and Ecosystem Health
Open Building Product Disclosure and Optimization credit for structural materials
posted by Michael Scharpf on
The scope is limit to finishing products only, whereas structural materials account for +60% of a building's mass.
LCA for only furniture, is it possible?
CI-v4.1 MRc2:Interiors Life-Cycle Impact Reductionposted by Eslam Ahmed on
We are currently working on a LEED ID+C certification project. It involves a rental space where our customer is just the tenant, who will take over the space fully finished.
Double-counting non-roof measures
NC-v4 SSc5:Heat island reductionposted by Jacopo Cattaruzzi on
Hi,
EA Prerequisite: Operational Carbon Projection and Decarbonization Plan - BPS rqmt
posted by Jamy Bacchus on
I would strike the 2nd draft inclusion of reviewing any regional BPS if it's in GHGi.