Stormwater Harvesting and Runoff Queries

NC-2009 SSc6.1:Stormwater Design—Quantity Control
posted by  Greg Kight  on 

We have a tall office building that has a cistern for rainwater harvesting. I have two related questions: 1.

3
Default Avatar
Designer
Croxton Collaborative Architects PC
LEEDuser Basic Member
2 thumbs up
Mon Oct 28, 2013, 5:19 pm

System's Manual in American English

NC-2009 EAc3:Enhanced Commissioning
posted by  Alicia Villanueva  on 

After submitting the documentation for this credit, we have been requested to translate the System's Manual to America English. The System's Manual we uploaded is composed of 494 pages, 486 of whi

3
Mon Oct 28, 2013, 1:20 pm

Contained Material

NC-2009 SSc3:Brownfield Redevelopment
posted by  Donald Green  on 

We have a project whereby hazardous material was found burried in sealed containers and per testing of the surrounding soil it does not apear any of the material has leaked into the soils.

3
Sr Project Manager / Operations Manager
Progressive AE
LEEDuser Basic Member
25 thumbs up
Mon Oct 28, 2013, 4:01 am

Revised Section 1.4 Form Units

NC-2009 EAp2:Minimum Energy Performance
posted by  HOUCINE TLEMSANI  on 

Hi i am working on a project and using the Revised section 1.4 Form since the project was been registered after mars 2013. The lighting part of the Form is a bit confusing.

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri Oct 25, 2013, 8:34 pm

SSc4.1 Awarded, now going for Exemplary performance. What to do?

NC-2009 IDc1:Innovation in Design
posted by  Luciana T.  on 

Our project already was awarded 6 points for the SSc4.1 Alternative Transportation - Public transportation Access when submitted for design review, but we noticed that we missed several other bus

2
Fri Oct 25, 2013, 6:51 pm

Green Houskeeping for v2.2 & v2009

NC-2009 IDc1:Innovation in Design
posted by  Donald Green  on 

Has anyone been able to submit the same Green Housekeeping Plan for ID credit based on v2009 for a v2.2 project?

3
Sr Project Manager / Operations Manager
Progressive AE
LEEDuser Basic Member
25 thumbs up
Fri Oct 25, 2013, 6:46 pm

Solar Array on LEED Building - But Not Property of Building

NC-2009 EAc2:On-Site Renewable Energy
posted by  Patty Lloyd  on 

I was wondering if anyone has had experience with this, and if this scenario can earn LEED points for on-site renewable energy.

3
Director of Sustainability
Leopardo Companies, Inc.
LEEDuser Premium Member
12 thumbs up
Fri Oct 25, 2013, 4:08 pm

Conference Tables in an Open-plan Office

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Ting Wang  on 

Our project interior has two conference tables placed in an open-plan office, for team discussions and brain-storms that are casual and spontaneous.

2
Fri Oct 25, 2013, 1:45 am

Combined metering for plug loads and lighting

CS-2009 EAc5.2:Measurement and Verification—Tenant Submetering
posted by  Rudolph Carneiro  on 

I am having lots of trouble with design teams in getting them to seperate internal lighting circuitry from plug loads.

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Oct 24, 2013, 11:28 pm

rainwater harvesting ACP for non-healthcare/retail projects

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Michael Maier  on 

The Water Use Reduction - Additional Guidance document seems to indicate that although on-site non-potable water sources for flush fixtures and/or flow fixtures (i.e.

3
Default Avatar
Leroy Street Studio
LEEDuser Basic Member
0 thumbs up
Thu Oct 24, 2013, 10:57 pm